background image

 

 

 
 
 

 

2. INTRODUCTION & SPECIFICATION

 

This heater produces a totally dry heat, no condensation, no  gas, no fumes. It reaches maximum heat output within a minute from 
being turned on. It is quick and easy to install reducing installation costs. Used with the CS-7 controller it can provide low / high heat 
or fan only settings.

 

 

Model 

SCHG-60T 

Power 

6000W 

Input supply 

220-240V 

Dimensions (W x D x H) 

575 x 592 x 152mm 

Weight 

13kg 

Recommended Mounting Height 

2.4 - 3M 

Safety Distance from Heater 

1.5M 

Optional Controller Model Number 

CS-7 

 

 

3. MOUNTING INSTALLATION 

 

3.1  CEILING MOUNTING 

The heater is intended for installation in a suspended ceiling mounted within or on the 'tee' bar supports. For optimum results do not 
fit  in ceilings  higher than  4m. As  air  is  only  introduced  through  the  front of  the unit the  heater may  be  sighted  anywhere.  The  air 
intake  and  discharge  areas  must  be  kept  completely  clear  for  a  minimum  of  1.5m  from  the  front  of  the  heater.  In  an  area  using 
multiple units, heaters should be spread to provide an even heat distribution. 

 

IMPORTANT! 

A minimum clearance of 205mm is needed between the bottom of the false ceiling and the original roof/ceiling 

to allow installation of the heater. 

 

IMPORTANT! 

DO NOT use plastic type diffusers as these may be damaged by the heat. 

 

IMPORTANT!

  Ensure  that  the  mounting  surface  /  ceiling  supports  are  capable  of  taking  the  additional  weight  of  the  heater 

there are 4 eye hooks supplied with the heater that should be used if additional support of the heater is required. 
When  using  the  diffuser  the  four  Z  brackets  provided  should  be  attached  to  the  side  of  the  heater  to  enable  the  heater  to  be 
supported by the 'tee' bar and immediately above the diffuser. 

 

4.  ELECTRICAL CONNECTIONS 

4.1  230V SINGLE PHASE 

– Without controls. 

Please make sure you have read the Safety instructions and that you are a suitably qualified electrician before continuing. 
Drawings show connections inside the black terminal box on the outside of the heater. 

Do NOT use power tools to undo or do up terminal screws.

 

Please Note:- Specified cable sizes are for typical installations, correction factors may need to be used when determining actual 
cable sizes. 

 
Standard Connection and Use 
 

 
 
Use 4mm² 3 Core Mains Cable (see note above). 
Connect Brown wire 

– Terminal 1 or L. 

Connect Blue wire 

– Terminal 5 or N. 

Connect Green / Yellow wire 

– Terminal E or 

 
 
Ensure the 3 links 

are  in  position  in  the  Control 

Box  between  terminals  1  and  2,  3  and  4,  4  and  5  as 
shown in drawing to the left. 
 
 
If  you  wish  to  de-rate  the  heater  from  6kW  to  4kW 
remove the link              between terminal 4 and terminal 
5  in  the  Control  Box.  Ensure  you  tighten  up  the  screws 
after removing the link. See drawing to the right. 

 
 
 

PLEASE  CHECK  ALL  CONNECTIONS  BEFORE  TURNING  ON  AS  INCORRECT  WIRING  IS  NOT  COVERED  BY  THE 
GUARANTEE

 

 

 

CS-7 Controller 

(Optional Extra) 

Содержание SCHG-60T

Страница 1: ...at a correctly rated fuse is fitted DO NOT use worn or damaged cables plugs or connectors Immediately have any faulty item repaired or replaced by a qualified electrician The unit should be protected by a suitably rated isolator and fuse or MCB This heater is IP20 rated and is suitable for indoor or under cover use only Do not attach this heater to an extension cord it must be hard wired in positi...

Страница 2: ...ing surface ceiling supports are capable of taking the additional weight of the heater there are 4 eye hooks supplied with the heater that should be used if additional support of the heater is required When using the diffuser the four Z brackets provided should be attached to the side of the heater to enable the heater to be supported by the tee bar and immediately above the diffuser 4 ELECTRICAL ...

Страница 3: ...to the CS 7 Controller see note above Remove any links that may be present in heater control box between terminals 1 2 3 4 or 5 Mains Cable Power Supply Box Connect Brown wire Terminal 1 or L Connect Blue wire Terminal 5 or N Connect Green Yellow wire Terminal E or Heater to CS 7 Controller Cable Colours for reference only Connect Brown wire Terminal 1 or L of heater and Top Terminal L2 on right D...

Страница 4: ...ree All moving parts are factory lubricated and therefore should require no service Maintenance is limited to keeping both the inlet and outlet areas free from any accumulation of dust or any other foreign materials This is especially important immediately before the heating season Any dust build up can be loosened using a brush and a vacuum cleaner applied to the airways to ensure completed remov...

Отзывы: