background image

Commissioning 

 

 

Perform Insulation and Earth continuity Tests.  

 

Switch on heater(s) and confirm that Ceramic element(s) operating.  

 

Ensure each heater aims its warmth into the target area by adjusting heater angle(s) as necessary then tighten 

bracket bolts when satisfactory coverage is achieved.  

 

The user/customer should be made aware of all aspects of operation and safety and strongly advised to retain these 

instructions for reference.  

 

In unoccupied premises it is recommended that the heating system is switched off and isolated from the electrical 

supply.  

 

Maintenance 

 

Ceramic Heaters contain no moving parts and therefore very little maintenance is required other than to ensure that there is no 

excessive build-up of dust/dirt on the reflectors or Ceramic elements especially after a long period of non-use can cause 

overheating and premature ceramic failure. Depending on siting conditions a heater should be regularly inspected, but at least 

once per year.  

 

Before any maintenance work is carried out 

 

 

 

Allow heater case/element to cool to avoid injury.  

 

 

 

Always isolate appliance(s) from electrical power supply.  

 

Spares 

 

 

 

Spare Ceramic elements and reflectors are available 

– contact your supplier for details.  

 

 

 

 

 

Отзывы: