Install “Magnetic Brackets”
One magnet bracket MUST be installed at each end of your gate, attached to
your rack. Supplied is a high bracket and a low bracket, when installed they
are designed to trigger the internal magnetic limit switch. This will stop the
gate cycle BEFORE making contact with the physical gate stops.
The best way to install the ‘magnetic brackets’ is to close the gate to hit the
stop, slide back open 50mm, now slide the
LOW
magnet bracket along the
racking
until
you see
‘L
6
’
light up on the main control board, then adjust
magnet on bracket and secure. To install
HIGH
magnet, open gate full and
pull back 50mm, now slide the
HIGH
magnet bracket along the racking till
you see
‘L
7
’
light up on the main control board, then adjust magnet on
bracket and secure.
Check that both fully open and fully closed ‘magnetic brackets’ are in place on
the gear rack and are functioning correctly. Check both fully open and fully
closed physical stops are securely in place.
Closing
direction
Closing
direction
K3
L1 L2
L3
L4 L5 L6 L7
LED9
LED8
F
FORCE TORQUE
STUDY
wireless receiver
SLOW THRUST
HIGH
magnet
end
HIGH
magnet
end
LOW
magnet
end
L6 & L7 LEDs
5/1
1