22
Fig. 22.2
Fig. 22.1
Siting the unit
Wear safety gloves when handling the
unit. Take care when touching the metal
parts, which could be sharp.
Site the unit away from sources of heat.
Leave at least 10 cm around the unit to
allow for aeration.
Filling the Ice Bank
Open the rear panel using the supplied
key.
Fill the ice bank using the specific inlet
pipe joint Ø5/16” (8 mm) (1).
The ice bank is completely full only when
water starts to come out of waste water
tube (2).
Once you have filled the ice bank, avoid
moving the unit.
If you have to move the unit, remember
to empty the ice bank first.
1
2
Содержание WAVE I.T.
Страница 1: ...1 6 0 0 0 9 1 5 0 3 EN mod Touch I T Light WAVE Us e M a i n t e n a n c e M a n u a l...
Страница 2: ......
Страница 12: ...12 Rear View 1 2 3 3 2 1 ENERGY SAVING button only I T VOL model IEC inlet power cord Support feet...
Страница 31: ...31 Service history Installation Technician Date Notes Signature Maintenance Technician Date Notes Signature...
Страница 33: ......
Страница 34: ......
Страница 35: ...160009 Rev 01 23 04 2016 11 59...