
65
31
42
36
32
68
43
20
MINIPRESS top
Start-up
Connecting the pressurised air
Connecting the extraction system
➢
Connect the air supply [68] to the air filter unit.
➢
Open the compressed air shut-off valve [32].
➢
The pressure indicated on the pressure gauge [31] should be 6 bar.
➢
The pressure can be set using the revolving knob [65].
■
During the following procedure, the drill unit makes an upward motion.
■
Only oil-free pressurised air may be used.
NOTE
Air consumption per work cycle is 1.5 litres.
➢
Insert the extraction hose into the upper extraction socket [42, 43] and secure it.
➢
Insert the extraction hose into the lower extraction socket [36] and secure it.
➢
Accessories, see www.blum.com.
Содержание MINIPRESS top M70.2000
Страница 2: ......
Страница 8: ...8 MINIPRESS top Safety Position of warning signs and danger zones Work area ...
Страница 16: ...15 6 81 16 MINIPRESS top Explanation of operating and control elements ...
Страница 52: ...52 MINIPRESS top Notes ...
Страница 53: ...53 MINIPRESS top Notes ...
Страница 54: ...54 MINIPRESS top Notes ...
Страница 55: ...55 MINIPRESS top Notes ...