background image

Do Not Duplicate, Alter, or Copy without the Express Written Consent  

of  BlueSky Mast, Inc.  Copyright 2013 Allendale LLC All Rights Reserved   

 

AL3 Lift Series - Deployment Quick Reference Sheet 

[email protected]

 

Read Manual Before Use 

Refer to detailed instructions in the 

AL3 Lift Series Manual at all times 

 

At  1/2  the  total  mast  height  - 
Lock  the  cam  lock  on  the Blue 

Secondary Guy Ring. 

Attach  the  blue  clip  from  the 
secondary  guy  rope  to  the 

round hole on the guy ring. 

Walk  away  from  the  mast  and 
unwind all the guy rope.  

DO NOT

 stake it at this time. 

Repeat  this  process  until  all 
secondary  guy  ropes  are  de-

ployed. 

DO NOT 

stake them. 

Raise the mast until the primary 
guy  ropes  go  taut.  Incremental 

guying may be required. 

41 

42 

43 

44 

45 

 

When the guy ropes go taut - hold the guy rope in front of the handle and 
slide it back approx. 4 feet. Doing this to all 4 primary guy ropes will give 

you enough slack to add another center mast pole.  

Repeat  this  process  until  you 
are left with only the Base Pole. 

Lower  the  lift  base  plate  and 
insert the Base Pole. Raise until 

it nest into the center mast pole. 

Release the cam lock and lower 
the  mast  to  the  ground.  Lock 

the cam lock. 

46 

48 

49 

 

Adjust the guy ropes by holding 
the  rope  in  front  of  the  handle 

and sliding it back and forth. 

Adjust the 4 primary guy ropes 
and  make  sure  the  mast  is 

straight and perpendicular. 

Lock  the  primary  guy  ropes  by 
pulling  a small amount of slack 

in. Continued next step - 

Then  grab  the  guy  rope  and 
wrap  it  up  and  over  the  front 

rope lock. 

Position  the  secondary  guy 
ropes between the primary guy 

ropes and extend them out. 

50 

51 

52 

53 

54 

55 

 

Stake  them  into  the  ground, 
adjust and lock all 4 secondary 

guy ropes. 

Drive 2 stakes into the 2 holes 
on the lift base plate. 

 

 

 

56 

57 

Отзывы: