Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2013 Allendale LLC All Rights Reserved
AL3 Lift Series - Deployment Quick Reference Sheet
Read Manual Before Use
Refer to detailed instructions in the
AL3 Lift Series Manual at all times
At 1/2 the total mast height -
Lock the cam lock on the Blue
Secondary Guy Ring.
Attach the blue clip from the
secondary guy rope to the
round hole on the guy ring.
Walk away from the mast and
unwind all the guy rope.
DO NOT
stake it at this time.
Repeat this process until all
secondary guy ropes are de-
ployed.
DO NOT
stake them.
Raise the mast until the primary
guy ropes go taut. Incremental
guying may be required.
41
42
43
44
45
When the guy ropes go taut - hold the guy rope in front of the handle and
slide it back approx. 4 feet. Doing this to all 4 primary guy ropes will give
you enough slack to add another center mast pole.
Repeat this process until you
are left with only the Base Pole.
Lower the lift base plate and
insert the Base Pole. Raise until
it nest into the center mast pole.
Release the cam lock and lower
the mast to the ground. Lock
the cam lock.
46
48
49
Adjust the guy ropes by holding
the rope in front of the handle
and sliding it back and forth.
Adjust the 4 primary guy ropes
and make sure the mast is
straight and perpendicular.
Lock the primary guy ropes by
pulling a small amount of slack
in. Continued next step -
Then grab the guy rope and
wrap it up and over the front
rope lock.
Position the secondary guy
ropes between the primary guy
ropes and extend them out.
50
51
52
53
54
55
Stake them into the ground,
adjust and lock all 4 secondary
guy ropes.
Drive 2 stakes into the 2 holes
on the lift base plate.
56
57