Blue-White APNTU Скачать руководство пользователя страница 4

Installation Requirements

Power Supply:

 100~240VAC 50/60Hz

Water Supply: 

Inlet water pressure should be from 7.25 – 30 psi (0.05-0.2MPa) 

with an inlet feedwater line diameter of ¼-inch O.D. Tubing. The APNTU is pro-

vided with an inlet Rotameter and flow regulating valve for sample water inlet 

flow control and limited pressure regulation. The range of inlet flow for the WR10 

should be consistently maintained between 200 and 400 mL per minute.

Inlet Water: Connect the ¼-inch inlet water tubing to the quick adapter provided. 

Consistent flow of 200-400mL is required.

Drainage:

 The WR10 outlet tube (3/4” ID Tubing) located on the bottom of the 

WR10, should be connected to a discharge drain via gravity flow.

Outlet Line:

 

Connect 3/4” ID tubing to the outlet drain. This is the sample water 

outlet flow. 

This line must be diverted to drain.

Wall Mount Space: 

The APNTU analyzer panel size is roughly 20” H x 36” W 

x 10” D  in dimension. Please accommodate sufficient space for mounting. The 

panel is equipped with pre-installed rear unistrut for simple wall mounting.

Wall Mount Weight:

 Approximately 45 lbs (20kg). Please use appropriate 

mounting hardware.

Wiring

The APNTU analyzer has universal AC power supply equipment allowing 

users simply to plug the power supply into a 100~240V AC 50/60Hz power 

outlet for normal operation.

The process of electrical connection to contact the 220V single-phase power 

supply, should be operated by personnel with an electrician's license. Failure 

to operate according to the electrical code of practice may result in electric 

shock injury or even death. 

Note: When in doubt regarding your electrical 

installation, contact a licensed electrician.

Содержание APNTU

Страница 1: ...Quick Start Guide APNTU Turbidity Analyzer Panel...

Страница 2: ...l time measurement display and data logging of Ultra Low Turbidity utilizing proprietary smart sensor technology coupled with a touch screen display and data logging terminal Reference the below dimen...

Страница 3: ...trical Schematics Quick Start Guide Tools Needed Follow these instructions before installing your analyzer to avoid failure Read this guide and Instruction Manual before using CAUTION The APNTU is des...

Страница 4: ...g to the outlet drain This is the sample water outlet flow This line must be diverted to drain Wall Mount Space The APNTU analyzer panel size is roughly 20 H x 36 W x 10 D in dimension Please accommod...

Страница 5: ...e and clean thoroughly Located strut and mount with appropriate tools Check to make sure strut is secure and level 2 4 Connect Electrical and Tubing Use provided electrical diagram to connect power an...

Страница 6: ...y necessary when changing parameter settings or performing calibrations To access this now press the icon and refer to Instruction Manual for more instructions regarding login and user management Real...

Страница 7: ...U USB 1 x USB host for data downloading and screen upgrade Internet RJ 45 socket Modbus TCP Panel Operational Temperature 40 113o F 4 45 o C Storage Temperature Instrument 4 131o F 20 55o C Sensors 32...

Страница 8: ...ssive heat or pressure or allowing the unit to support the weight of related piping BLUE WHITE does not assume responsibility for any loss damage or expense directly or indirectly related to or arisin...

Отзывы: