![Blue-White APNTU Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/blue-white/apntu/apntu_quick-start-manual_2776890003.webp)
IMPORTANT
Safety instructions
PRE-INSTALLATION
Before you begin
To access the wiring terminal, open the enclosure by
loosening the four screws with the screwdriver. The
Analyzer must be powered by 100~240VAC 50/60Hz.
Communication wiring should be 20-24 AWG(American
Wire Gauge) shielded cable.
Planning
Ensure location of Analyzer complies with existing codes
and regulations. Location of mounting must be strong
enough to support weight of Analyzer and water. Analyzer
and mounts are not designed to support any other
structures, piping, or equipment.
Wiring
In the Box
• APNTU Analyzer Panel
• Pre-Mounted Struts
• Pre-mounted Flow Meter
• Turbidity Sensor
• 1/4” tubing OD
• 3/4” tubing ID
• Concrete Anchors
• Electrical Schematics
• Quick Start Guide
Tools Needed
Follow these instructions before installing your analyzer to avoid failure. Read
this guide and Instruction Manual before using.
CAUTION
The APNTU is designed to be installed and operated by qualified personnel only.
Please note that warranty coverage does not include damage due to misuse or
improper installation.
CAUTION
Always wear eye protection when using chemicals.
CAUTION
Do not exceed maximum pressure. High pressure and temperature will damage
the system.
PRESSURE
Plumbing
Incoming water supply and drainage piping should
be planned before installing the Analyzer. Additional
components may be required to connect to the provided
tubing.
Need more information. Please contact customer service with questions.
[email protected] 714-893-8529
Scan QR code to download
full Instruction Manual.
•
Phillips Screwdriver
•
Adjustable wrench