Page 4
Page 5
C-600
C-600
4.0
How To Install the Metering Pump
Note:
All diagrams are strictly for guideline purposes only. Always
consult an expert before installing the metering pump into specialized
systems.
The metering pump should be
serviced by qualified persons only.
4.1
Mounting Location
!
Choose an area located near the chemical supply tank, chemical injection
point and electrical supply. Install the pump where it can be easily serviced.
!
Mount the pump to a secure surface or wall using the enclosed hardware.
Wall mount to a solid surface only. Mounting to drywall with anchors is not
recommended.
!
Keep the outlet (discharge) tubing as short as possible. Longer tubing
increases the back pressure at the pump head.
!
Do not mount the pump directly over your chemical container. Chemical
fumes may damage the unit. Mount the pump off to the side or at a lower level
than the chemical container.
!
Mounting the pump lower than the chemical container will gravity feed the
chemical into the pump. This “flooded suction” installation can reduce the time
required to prime the pump. Install a shut-off valve, pinch clamp or other
means to halt the gravity feed to the pump during servicing.
!
Your solution tank should be sturdy. Keep the tank covered to reduce fumes.
!
Be sure your installation does not constitute a cross connection with the
drinking water supply. Check your local plumbing codes.
CAUTION: PROPER EYE AND SKIN PROTECTION MUST BE WORN WHEN
INSTALLING AND SERVICING THE PUMP.
CAUTION - TO PREVENT CHEMICAL OVERDOSING WHEN USED AS A POOL
OR SPA CHLORINATOR, POWER MUST BE REMOVED FROM THIS PUMP
DURING THE BACKWASH CYCLE AND DURING PERIODS OF NO FLOW IN THE
RECIRCULATION SYSTEM.
CAUTION - TO ENSURE CHEMICAL DOES NOT SYPHON THROUGH THE
PUMP, INSTALL THE INCLUDED SPRING-LOADED INJECTION CHECK-VALVE
OR A SUITABLE ANTI-SYPHON VALVE.
5.0625”
134.9mm
0
1
2
3
4
5
6.75”
171.5mm
6.25”
158.8mm
C-600P
C-600HV
0
1
2
3
4
5
6.75”
171.45mm
6.125”
155.5mm
7”
177.8mm
3.1
Pump Dimensions