nut.
3.5 Reassemble the pipe spacer and the long bolt 7and secure
it tightly with gasket and nut.
Then screw the nut tight in 6 place.
4. Attaching the chipper tube to the basic machine.
1 2
3
4.1. Put the chipper tube 2 in place on the side of the basic machine. Align the three
mounting holes in the flange with three holes around place 1.
4.2. Secure the flange with gaskets and nuts M8. Make sure the chipper tube has no
deflection before tighten the nuts.
5. Mounting the discharge grid
5.1. Remove the thumbscrews on both sides of the movable door and lift the door on the
highest position. Hook the grid on the axis of the door and clamp the grid with the spring to
prevent the grid falling off.
5.2. Put lower part of the grid outside of lower axis in the discharge opening. Tighten the
screws M5*15 on the left and right side of discharge opening to fix the grid.
6. Mounting frame
6.1. The steel frame can be used as handle grip. Firstly, attach the steel bar on both left and
right side of hopper by screws. Please do not tighten the screws.
6.2. Put the frame on the bars and fix it by tightening the screws. Then tighten the screws on
the hopper.
7. Safety instructions for machine with bagging attachments.Cover the discharge opening
with nylon bag and tighten the tie. When the machine is working, the chips come into the bag.
That’s easy to collect the chips.
8. Check all the screw, bolts, nuts and tighten them if they get loose.
9. Add fuel to engine.
9.1. There is no fuel and oil in new engine.
9.2. Open the cover of fuel tank and add pure gasoline.
See picture 5.Do not fill closer than 10mm
to 15mm from the top of the fuel tank.
The cover of fuel tank
Содержание CS-65
Страница 1: ...CS 65 6 5HP CHIPPER SHREDDER OPERATION MANUAL...
Страница 10: ......