
D
D
A
C
E
E
AA
BB
BB
INSTALLATION INSTRUCTIONS
Measure the distance between the handlebars and the back of
the seat of the bicycle (sold separately).
1.
2.
3.
Transfer the seat/handlebar measurement along a ceiling joist so the lift
assembly (E) and pulley plate (D) line up. If you need to mount the bicycle
pulley unit in the opposite direction of the joist, simply mount on a board and
then securely attach the board to the joist as shown. Secure the screw eye
hook (BB) about 12 in. from the pulley plate (D). Using the screws (AA),
mount the pulley plate (D) and the lift assembly (E) to the ceiling joist,
ensuring they line up with the handlebar/seat measurement (lift will operate
better if this measurement is accurate). Pre-drilling 1/8 in. pilot holes is
recommended.
Tie a double knot on the end of the rope (C). Feed the rope through the
screw eye hook (BB) and secure to the eyelet. Thread the rope through a
hook pulley (A), then pulley plate (D), then the second hook pulley (A) and
lift assembly (E) as shown. Be sure to the thread the rope down through
both parts of the locking mechanism in the lift assembly.
1
3
2
2