Blue Hawk BICYCLE PULLEY Скачать руководство пользователя страница 2

D

D

A

C

E

E

AA

BB

BB

INSTALLATION INSTRUCTIONS

Measure the distance between the handlebars and the back of 

the seat of the bicycle (sold separately).

1.

2.

3.

Transfer the seat/handlebar measurement along a ceiling joist so the lift 

assembly (E) and pulley plate (D) line up. If you need to mount the bicycle 

pulley unit in the opposite direction of the joist, simply mount on a board and 

then securely attach the board to the joist as shown. Secure the screw eye 

hook (BB) about 12 in. from the pulley plate (D). Using the screws (AA), 

mount the pulley plate (D) and the lift assembly (E) to the ceiling joist, 

ensuring they line up with the handlebar/seat measurement (lift will operate 

better if this measurement is accurate). Pre-drilling 1/8 in. pilot holes is 

recommended.

Tie a double knot on the end of the rope (C). Feed the rope through the 

screw eye hook (BB) and secure to the eyelet. Thread the rope through a 

hook pulley (A), then pulley plate (D), then the second hook pulley (A) and 

lift assembly (E) as shown. Be sure to the thread the rope down through 

both parts of the locking mechanism in the lift assembly.

1

3

2

2

Отзывы: