Blue Giant BLUE GENIUS SERIES Скачать руководство пользователя страница 11

8.                                    TEST OPERATION

 

With  the  overhead  door  open,  test  operate  the  Vertical 
Storing  Dock  Leveler  as  follows  to  ensure  that  all  functions 
are operating correctly and adjustments are properly set.

1.

   Shut off the power to the dock and the Blue Genius

TM

 control 

station.  Using  a  crane,  boom,    or  similar  type  of  lowering 
equipment, carefully lower the deck until it is fully horizontal. 
Then turn the power back on. 

2.

    After both the dock and control station have completed the 

‘power on’ cycle, touch and hold the ’Deck’ touch button to 
raise  the  deck  and  lip.  When  the  deck  reaches  its  fully 
raised  position  and  stops,  it  must  be  properly  upright 
(slightly past vertical). If not, the deck lift cylinder requires 
readjusting. This is accomplished by removing the cylinder 
pin,  loosening  the  setscrew  and  turning  the  threaded 
adjustable rod eye of the cylinder: counterclockwise out of 
the cylinder rod to lengthen the cylinder, or clockwise into 
the cylinder rod to shorten it. The set screw must then be 
tightened to lock the rod eye in position. (See Figure 1)

  

3.

   Touch  and  hold  the  ‘Down’  touch  button  to  allow  the  dock 

leveler deck, with the lip extended, to descend.

4.

    Release  the  ‘Down’  touch  button. The  motion  of  the  deck 

must stop at any position when the button is released.

5.

 Touch and hold the ‘Lip’ touch button. The deck will remain 

stationary and the lip will lower.

6.

   Release the ‘Lip’  touch button, then press it again. The lip  

will resume the extended position.

7.

   Operate the ‘Down’ button. The deck and the extended lip 

will  descend  to  the  bottom  of  the  pit  and  stop  at  the  fully 
below dock level position. 

Note: 

If  a  transport  vehicle  had  been  parked  in  place 

against the dock bumpers, the lip would have come to rest 
on  the  vehicle  load  bed,  allowing  loading  /  unloading  to 
begin.

  

8.

    Perform  a  final  inspection  and  determine  that  all  work  is 

completed  satisfactorily.  Clean  the  pit  and  work  area 
thoroughly  and  apply  touch-up  paint  to  weld  burn  areas, 
scratches, etc.

9. 

  Test operate the unit through several cycles of all functions.

10.

  Mount the Owner’s Manual securely in a place where it can 

be easily and immediately accessed by the operator.

 

Control Box Illustration

Never allow a transporter vehicle to depart when the deck is fully 
deployed  with  the  lip  resting  on  the  surface  of  the  transporter 
vehicle  load  bed.  Serious  damage  to  the  dock  leveler  and  /  or 
personal injury could occur.

Never  enter  the  pit  area  without  locking  out  the  electrical  power 
supply and engaging the maintenance strut.

DECK UP

DECK DOWN

STOP FUNCTION

LIP OUT

www.BlueG

iant.com

Gold Series    

TM

T

o

u

c

h

 

 

 

C

o

n

t

r

o

l

DISC

ONN

ECT PO

WER

BEFOR

E  OPEN

ING.

READ 

AND FU

LLY U

NDER

STAN

THE O

WNE

R’S M

ANUA

L BE

FORE

 

OPERA

TING

 THIS

 PRO

DUCT

.



R

#038

-244E

Do Not Enter

Proceed With Caution

STOP

0

ESC

SEL

8 9

7

5 6

4

2 3

1

D

O

C

K

L

E

V

E

L

E

R

Enter On Gr

een 





Blue Genius

Figure 1 : 

Lift Cylinder Rod Adjustment

SHORTEN

LENGTHEN

SET SCREW

U-SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS™ CONTROLS

 

9

Содержание BLUE GENIUS SERIES

Страница 1: ...S MANUAL FAILURE TO DO SO MAY RESULT IN PROPERTY DAMAGE BODILY INJURY OR DEATH INSTALLATION OWNER S MANUAL U SERIES VERTICAL STORING DOCK LEVELER with BLUE GENIUSTM CONTROLS U Series Vertical Storing...

Страница 2: ...5 Cylinder Installation 8 8 TEST OPERATION 9 9 CONTROL STATION OPERATION 10 10 OPERATING INSTRUCTIONS 11 10 1 Functional Description 11 10 2 Stop Button Function 11 10 3 Starting Procedure 11 10 4 Dep...

Страница 3: ...er and dock attendants of safe unsafe conditions Its onboard diagnostics and communications feature a user friendly multi language LCD intelligent text display and keypad with supervisory override The...

Страница 4: ...ture is not subject to compensation The manufacturer reserves the right to make changes at any time to the modules components and accessories concurrent with its continuing product development program...

Страница 5: ...components DO NOT attach welder as ground to leveler platform when welding on base frame assembly Attach welder ground to base frame assembly only Damage to bearings or hydraulic equipment will occur...

Страница 6: ...FF position or disconnected from the energy source Blue Giant strongly recommends that only OSHA approved lockout devices be utilized The energy isolating device must bear a prominent warning tag indi...

Страница 7: ...pin from the bracket on the platform 3 Move the maintenance strut from the stored position to the engaged position See diagram below 4 Insert the locking pin through the maintenance strut and lock it...

Страница 8: ...O THE I O BOX ABOVE THE POWER PACK FOR THE COMMUNICATION CABLES OUTSIDE TRAFFIC LIGHTS DOOR SENSOR CABLE OPTIONAL RUN ONE 1 1 2 I D CONDUIT FROM THE CONTROL STATION POWER LINE CONNECTION TO THE DOCKS...

Страница 9: ...unication cable 5 Run one 1 2 I D conduit from the control station to the dock s hydraulic power pack motor junction box 7 3 Electrical and Hydraulic Dock Installation 6 Complete the electrical hookup...

Страница 10: ...ly attach the fully loaded hose to the deck cylinder s base end fitting Place the LIP hose end into an appropriate container and then touch and hold the Lip button to run the power unit until clear oi...

Страница 11: ...tton then press it again The lip will resume the extended position 7 Operate the Down button The deck and the extended lip will descend to the bottom of the pit and stop at the fully below dock level...

Страница 12: ...9 CONTROL STATION OPERATION CONTROL STATION TYPE Independent Vertical Dock Leveler Caution YELLOW LIGHT Proceed With Caution U SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS CONTROLS 10...

Страница 13: ...that the dock attendant must hold the touch button to lower the unit Key features include high tensile steel U beam deck construction hydraulic fall safe maintenance strut and a self locking device 10...

Страница 14: ...ge to Deck Lowering When the deck has fully deployed the LCD screen will read Deck Deployed www BlueGiant com Gold Series TM enius G lue B T o u c h C o n t r o l DISCONNECT POWER BEFORE OPENING READ...

Страница 15: ...ANUAL BEFORE OPERATING THIS PRODUCT R 038 244E Do Not Enter Enter On Green STOP 0 ESC SEL 8 9 5 6 4 1 3 2 D O C K L E V E L E R Blue Genius 4 7 www BlueGiant com Gold Series TM enius G lue B T o u c h...

Страница 16: ...er is a potential source of danger to the operator and to other personnel working near it As with all quality equipment keep the dock leveler in good operating condition by following the recommended s...

Страница 17: ...Strut Lip Latch Check Weather Seals Check Ramp Rear Hinges Check Dock Seal Dock Shelter Check Dock Leveler Structure Sub Frame Shim Lubricate Rear Hinges Pins Lubricate Dock Leveler Lip Hinge Structur...

Страница 18: ...LUSTRATION VERTICAL STORING DOCK 6 5 28 16 3 2 1 15 17 26 24 27 8 7 9 10 18 19 13 12 11 4 23 14 13 14 3 25 22 21 21 22 23 20 6A 6B 6C 16 18 20 U SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS C...

Страница 19: ...QTY PART NO DESCRIPTION 15 1 23 003336 O Cylinder Assy 16 1 23 003569 Pin 17 1 200 02704 1 Pin Cylinder 18 2 23 003568 Clevis Plate 19 4 010 048 HHCS 20 4 012 220 Regular Spring Lock Washers U S 21 2...

Страница 20: ...RE REQ D 1 M O T T O B P I L R E D N I L Y C N I P 6 9 1 7 0 1 QTY 1 Part 013 010 Spring Pin Complements for Hydraulics Main Cylinder Part Description Qty Req d 23 003336 1 CYLINDER ASS Y WITH SENSOR...

Страница 21: ...76 3 3 32 78 1 7 16 37 VIEW A MOUNTING HOLE LOCATIONS 5 8 DIA 2 PLACES LIP SOLENOID Hydraulic Connection LIP Hydraulic Connection DECK UP Hydraulic Connection DECK DOWN Hydraulic Connection DECK SOLE...

Страница 22: ...Part Number 1 3 16 DIA SPRING PIN X 1 50 013 027 2 SERVICE STAND 23 003585 3 PIVOT PIN 23 003324 4 CYLINDER PIN 200 02704 1 5 SWIVEL LEVELING MTG 23 003570 6 PIN SERVICE STAND 23 003586 7 LOCK PIN 01...

Страница 23: ...pt to run No sound is heard main power supply is present Deck does not begin to rise immediately when motor runs Deck rises in delayed action 1 Air is trapped in the deck lifting cylinder Bleed the sy...

Страница 24: ...Repair as required Fill hydraulic reservoir with clean new hydraulic fluid Correct oil level is 1 2 below the bottom of the filler neck of the reservoir when the deck and lip are in their fully lower...

Страница 25: ...NOTES U SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS CONTROLS 23...

Страница 26: ...NOTES U SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS CONTROLS 24...

Страница 27: ...NOTES U SERIES VERTICAL STORING DOCK LEVELER WITH BLUE GENIUS CONTROLS 25...

Страница 28: ...Brampton ON Canada L6W 3K2 t 905 457 3900 f 905 457 2313 USA 6350 Burnt Poplar Road Greensboro NC 27409 www BlueGiant com If calling within North America t 1 800 668 7078 f 1 888 378 5781 Copyright Bl...

Отзывы: