background image

9.

After end of final cycle, turn tank heater
switch to ON position   top portion of
switch rocker pressed in.

10.

When tank water is up to proper temper-
ature, the green READY TO BREW light will
be lit.

NOTE: During the initial 

 some

water will drip from spray disc.
This is normal.

11. Discard all water in reservoir and brew one (1)

additional cycle. 

CAUTION! 

Water dispensed from

spray disc will be 

HOT! 

Watch out for splashing.

If water level needs to be adjusted, see tea brewer

adjustments.

12.

Discard water in six gallon dispenser, place

brew-through cover on dispenser then reposition
empty dispenser on brewer.

13.

Place filter and tea in brew chamber. Slide brew

chamber into place on brewer.

14.

Brewer is now ready for brewing tea.

BREWING

1.

Place filter paper in brew chamber and add

5.

tea. Slide brew chamber into rails, pushing

it to full back stop location.

2.

Check to see that reservoir with cover is pro-
perly located to accept dilute water spout

flow and brew chamber drain flow.

6.

3.

Press brew switch to initiate brewing cycle.

4.

Dilute water will begin to flow immediately

7.

into reservoir. Brewed tea will begin to flow

from brew chamber in about 20 to 30

seconds, and continue for approximately 10 to

12 minutes. Make sure drip-out is complete

before removing brew chamber.

If for any reason there is a need to stop the

brewing cycle before its completion, press the
“Brew Stop” switch. This stops water flow to the
brew chamber and the flow from dilute water
spout. The timing cycle is also cancelled and

timer resets to start.

Check level in reservoir - finished brew should
be approximately 1” from top edge.

Brewed tea is now ready for use. If a change in
strength is desired, add or reduce tea, to taste .
preference and continue for approximately 10 to 12
minutes. Make sure drip-out is complete before
removing brew chamber.

The brewer is factory adjusted to produce six (6)
gallons of tea in a 1-5 

 to dilute water ratio.

Should it become necessary to adjust for total

volume, follow these steps below.

3.

4.

TIMER ADJUSTMENT

(Total Volume Change)

1. Unplug unit.

5.

2.

Remove four (4) screws (2 on each side of cover) 
lift off cover to expose timer.

TEA BREWER ADJUSTMENTS

To brew more tea, turn knob slightly clockwise; to
brew less, turn slightly counterclockwise.

Plug unit in and cycle unit. Check for required

volume - repeat if needed, until desired volume

is attained. Replace cover on brewer.

Normal delivery should be six (6) gallons (766

ounces) of water.

Do not readjust setting of needle valve!

Page 4

Содержание Integrity 8746

Страница 1: ...NG INSTRUCTIONS MAINTENANCE INSTRUCTIONS and PARTS LIST Brewing Systems FOR ICED TEA 70473 8746 M INTEGRITY OWNER S MANUAL BLOOMFIELD INDUSTRIES 2 ERIK CIRCLE P O BOX 280 VERDI NEVADA 89439 FAX 800 35...

Страница 2: ...WARRANTY 11 The INTEGRITY BREWERS have been designed with adjustment flexibility to cover a wide spectrum of customer needs Adjustments on the running thermostat and inlet timer are simple adjustments...

Страница 3: ...varies greatly a pressure regulator should be installed The unit is shipped from the factory with a 3 wire 2 pole polarized power cord and cap attached in the water supply line SET UP 1 Carefully rem...

Страница 4: ...in about 20 to 30 seconds and continue for approximately 10 to 12 minutes Make sure drip out is complete before removing brew chamber If for any reason there is a need to stop the brewing cycle before...

Страница 5: ...losed position NEEDLE VALVE FOR BREW RATIO CHANGE SOLENOID V A L V E 4 Water flow from spray disc and dilute spout should be measured separately to determine that the desired ratio has been achieved N...

Страница 6: ...DISC 8718 31 PILOT LT GREEN 125V 8707 28 BREW SWITCH ROCKER 8812 79 SWITCH MOMENTARY NC 8707 34 SWITCH LIGHTED 12OV 8543 23 TINNERMAN NUT 8746 22 BODY WELDED ASSY 8746 16 WATER SPOUT ASSY 88 12 56 MAL...

Страница 7: ...NEL 63 8942 92 NUT 8 32 KEPS HEX 65 8746 30 TEA 6 G STAND BASE 66 D 20002 3 10 32 X 5 16 PN P SS 67 8033 56 LEG LEVELER CAP 68 8033 55 LEG LEVELER 69 88 12 47 FITTING NYLON Y3 16 70 8746 27 END CAP FO...

Страница 8: ...EXPLODED VIEW OF BREWING UNIT MODEL 8748...

Страница 9: ...lght Glass REPLACEMENT PARTS LIST REF NO PART NO DESCRIPTION 1 6600 50 2 8600 28 3 6600 12 4 6600 6 5 6600 15 6 6700 25 L 7 6600 26 6 6600 27 9 6942 33 10 6606 l 11 6606 5 12 66061 Nut Flat Washer Nyl...

Страница 10: ...V 2 8541 120K Solenoid Repair Kit Vacuum Pat consists of 2A Spring 28 Plunger 2C Seal Ring 3 8541 120JS Solenoid Repair Kit Vacuum Pat consists of 2A Spring 28 Plunger 2C Seal Ring 20 Service Wrench 4...

Страница 11: ...ng element is energized before water tank is filled Recommended Bloomfield servicing procedures are not followed How to Order Individual users and owners must order replace ment parts thru their distr...

Страница 12: ...Drain Tank STEP 3 Set the Brewer on It s side and remove the Bottom Base and Legs ITEM 2 FIG A STEP 4 Locate the Base Extender ITEM 4 and the Speed Nuts ITEM 3 included in the Kit Push the Speed Nuts...

Отзывы: