background image

22 

WIRING DIAGRAM 

Содержание 9221EUFC

Страница 1: ...U OWNERS MANUAL for SS2 SERIES DUAL SATELLITE COFFEE BREWERS with ELECTRO MECHANICAL CONTROL and EXTERNALLY HEATED SATELLITE SERVERS MODEL 9221EUFC Includes Installation Operation Use Care Servicing I...

Страница 2: ...coffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHAN...

Страница 3: ...ed to properly install this appliance and to use care for and maintain or repair the appliance in a manner which will ensure its optimum performance WARRANTY STATEMENT xi SPECIFICATIONS 1 FEATURES OPE...

Страница 4: ...FEATURES AND OPERATING CONTROLS 2 Fig 1 SS 2 Satellite Brewing System Features Operating Controls...

Страница 5: ...so lists voltage and wattage rating of brewer Glows when the tank water is up to temperature Located on lower right rear of brewer Turns main power to brewer ON or OFF Positions externally heated sate...

Страница 6: ...requires the use of tools must be performed by a qualified technician This manual is considered to be a permanent part of the appliance This manual and all supplied instructions diagrams schematics p...

Страница 7: ...stallations of 12 4 meters or less and not less than 3 8 10 mm I d copper tubing for installations exceeding 12 4 meters Brewer must be connected to a COLD water line NOTE DO NOT use a saddle tap for...

Страница 8: ...appliance by a licensed electrician Refer to General Layout Data sheet for electrical ratings SUPPLY CORDS Power supply cords should be oil resistant sheathed flexible cable not lighter than ordinary...

Страница 9: ...cure and leak proof 1 CHECK BREWER FOR PROPER CONFIGURATION Make sure spray disk gaskets are in place INSIDE of spray heads Make sure spray disks are properly installed Check hot water faucet for prop...

Страница 10: ...lean and properly installed Verify that the gaskets are properly installed inside the spray heads Check the brew chambers Check that the brew chambers are clean START UP Press POWER SWITCH back of bre...

Страница 11: ...s fully seated Press appropriate WARMER SWITCH to ON Select Brew Volume Press VOLUME SELECT switch to 1 GAL or 1 1 2 GAL Start the Brew Press either the right or left START BREW key NOTE The brew can...

Страница 12: ...ter and allow to air dry 7 Wash brew chambers in a sink using warm water and a mild detergent Rinse with clean water and allow to air dry 8 Remove and drain the drip tray Rinse in a sink under warm ru...

Страница 13: ...rd Then pull ears forward Lift guard off of retaining clip b Remove sight glass tube from silicone elbow Run the sight glass brush through the tube at least ten times c Reassemble the tube to the sili...

Страница 14: ...panel then remove the tank lid assembly Do not disconnect the tank assembly at this time 3 Siphon all water from the hot water tank 4 Mix 10 gallons of deliming solution according to the manufacturer...

Страница 15: ...ray disks 13 Reconnect brewer to electrical supply 14 Install the brew chamber without filter paper or grounds 15 Place an empty satellite under the brew chamber Run at least five 1 1 2 gallon brew cy...

Страница 16: ...container to calibrate volume 1 Press HEATER ON OFF switch to OFF Turn POWER switch on back of brewer OFF 2 Remove TOP PANEL Operating controls are accessible through the top panel only 3 Adjust the...

Страница 17: ...switch on back of brewer OFF 2 Remove TOP PANEL Operating controls are accessible through the top panel only 3 Remove one of the plugs in the tank cover and insert a thermometer of known accuracy 4 Lo...

Страница 18: ...Too many paper filters or wrong filter used Use one genuine Bloomfield paper filter per brew Chamber discharge hole plugged Clean brew chamber Timer not set properly Set timer Too much coffee or too...

Страница 19: ...RD 1 4 86577 FAUCET SHANK ASSY 1 4 1 86600 FAUCET MODEL ESP 1 4 2 8700 25L SEAT CUP 3S10 1 4 3 84392 HANDLE 13SBE SNAP 1 4 4 84394 C RING 18 1 1 4 5 8600 26 NUT HEX 1 4 6 84395 SHANK 1 5 84299 HOUSING...

Страница 20: ...EXPLODED VIEW CABINET AND EXTERIOR COMPONENTS 18...

Страница 21: ...LIGHTED 20A 250V 1 24 82936 SWITCH ROCKER ON OFF 1 25 LOWER HOUSING 1 26 COVER TOP HOUSING 1 27 FRONT PANEL 1 28 PLATE BOTTOM ASSY 1 29 BASE WRAP 1 30 85123 TIMER FULL 2 3 1 3 230V 2 ITEM P N DESCRIP...

Страница 22: ...EXPLODED VIEW INTERIOR COMPONENTS 20...

Страница 23: ...ONE 50 ID x 4 25 2 18 8043 11 ELBOW OUTLET 2 19 83384 TUBE VENT EXTENSION 4 20 83537 TUBE SILICONE 9 1 ITEM P N DESCRIPTION QTY 21 84619 VALVE DISPENSING ADJUST 2 22 82148 LOCK WASHER 1 23 55485 NUT 1...

Страница 24: ...22 WIRING DIAGRAM...

Страница 25: ...nd flows over the grounds in the brew basket Each half of the brewer is independently controlled HOT WATER FAUCET The HOT WATER FAUCET is fed by gravity from the hot water tank The faucet is spring lo...

Страница 26: ...ier Commercial Refrigeration In US and Canada Telephone 775 689 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only Bloomfield Industries proudly supports CFESA Comm...

Отзывы: