6
LEVELING AND ANCHORING THE CABINET
1. Place appliance in the installation position.
2. Place a carpenter’s level on top of the appliance and turn the adjustable feet to level
side-to-side and front-to-back.
3. Mark hole locations on the floor through the anchoring holes provided in the rear
flanged adjustable feet.
4. Remove appliance from installation position and drill holes in locations marked on
the floor. Insert proper anchoring devices (not supplied).
5. Place appliance back in the installation position.
6. Place carpenter’s level on top of appliance and re-level side-to-side and front-to-
back.
7. Bolt and anchor appliance securely to the floor.
8. Seal bolts and flanged feet with Silastic or equivalent compound.
INSTALLATION CODES AND STANDARDS
The boiler must be installed in accordance with:
Gas installation to conform to local codes, or in absence of local codes, with the National
Fuel Gas Code - ANSI Z223.1/NFPA 54. In Canada installation to be in accordance with
CSA B149.1 Natural Gas and Propane Installation Code.
1. The appliance and its individual shut off valve must be disconnected from the gas
supply piping system during any pressure testing of that system at pressures in
excess of ½ psig (3.5 kPa).
2. The appliance must be isolated from the gas supply piping system by closing its
individual manual shut off valve during any pressure testing of the gas supply piping
system at test pressures equal to or less than ½ psig (3.5 kPa).
Electrical grounding must be provided in accordance with local codes, or in the absence
of local codes, with the National Electrical Code ANSI/NFPA 70. In Canada, installation
must be in accordance with the Canadian Electrical Code CSA C22.2.