
Installation
5
Owner’s Responsibilities
1.
Oven(s) are uncrated and put in place.
2.
The owner/operator must have the following
plumbing, gas and electrical requirements
met and installed.
NOTE: Refer to the Utility Connection infor-
mation provided.
WARNING!!
Improper installation, adjustment, alter-
ation service or maintenance can cause
property damage, injury or death. Read
the installation, operation and mainte-
nance instruction thoroughly before in-
stalling or servicing this equipment.
ELECTRICAL -- BC-20G
115V --- 15 amp Nema 5-15 receptacle
208/240V --- 20 amp Nema 6-20 receptacle
PLUMBING -- BC-20G
Water
Water Pressure (min/max)
40 PSI min/50 PSI max
Water Connection
3/4” Hose Fitting, 3/8” ID hose minimum
Pressure Regulator Setting
35 PSI Preset
Minimum Requirements
TDS --- less than 100 parts per million
Total Hardness --- 80-120 parts per million
C
h
lor
i
d
e
---
le
s
s
t
h
a
n
30
p
a
r
t
s
p
e
r
million
l
pH
Fa
ct
or
---
7.
0
-8.
0
D
ra
ina
g
e
Atmospheric Vented Drain
Drain Connection
2” NPT
Avg Water Drain Temp.
122
_
F (50
_
C)
GAS PRESSURE -- BC-20G
Gas Input
Steam
90,000 BTU/HR
Hot Air
125,000 BTU/HR
Inlet Pressure to the Unit
Natural Gas
5---14” WC (1.24---3.48 kPa)
Propane
11---14” WC (2.73---3.48 kPa)
Pressure at the Manifold
Natural Gas
3.5” WC (.87 kPa)
Propane
10” WC (2.49 kPa)
1” FNPT connector for all US and Canadian installations