9
|
BLAZE OUTDOOR
STEP 2
Install the two grease trays in the front and
back of the unit. When installed, these trays.
will accept the grease filters on the bottom
side.
Electrical Requirements - Hood comes with -foot cord, and will plug into a 110V
outlet which should be wired to a AMP breaker.
wall hood installation
Install all grease
fi
lter handles to the
fi
lters using
the included screws. Three
fi
lters cover the front
section of the hood and three cover the rear.
Install the
fi
lters leaving the bottom of the
fi
lters
resting in the previously installed grease trays
and the tops will lay in the U shaped channel in
the center support. Install the center grease
trays
fi
rst (as there is an opening for the tray to
leaving the middle tray for last.
STEP 3
When installing the drip trays, place
each tray in
the recession at the front and rear as show in the
drawing. Be sure to have the small front bend
hook over the lip of the recession.
10
3