B
LACKHEAT
®
HE I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
12 of 73
Fi
g
ure 17: Critical Han
g
er Placement
For suspension angles other than sho
w
n, additional chain supports may be required.
* Allows for thermal expansion of system.
Hanger
Side View
Front View
Hanger
Bow Shackle
I-Beam
I-Beam
Beam
Clamp
Bow
Shackle
Anchor
Concrete
Beam
Locknut
Washer
Screw Hook
min. 10 mm
Washer
Wood
Beam
Turnbuckle
(not included)
600 mm
minimum*
300 mm
minimum*
10 mm
Rod
Typical Suspension Details
45° Angle
100 mm
Max.
Description
Part Number
Burner Tube
03051100
S-hook
91907302
Spring Hook
91903300
Bo
w
Shackle
E0007576
Tube/Reflector Hanger
03090100
Содержание HE15ST
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 20: ...BLACKHEAT HE INSTALLATION OPERATION AND SERVICE MANUAL 14 of 73 Figure 18 Linear General Assembly Overview ...
Страница 23: ...SECTION 6 LINEAR DOUBLE LINEAR HEATER INSTALLATION 17 of 73 Figure 20 Double Linear General Assembly Overview ...
Страница 33: ...SECTION 7 U TUBE HEATER INSTALLATION 27 of 73 Figure 22 U tube Assembly Overview ...
Страница 69: ...SECTION 16 TROUBLESHOOTING 63 of 73 16 1 Troubleshooting Flow Chart Linear Double Linear and U Tube ...
Страница 72: ...BLACKHEAT HE INSTALLATION OPERATION AND SERVICE MANUAL 66 of 73 Troubleshooting Flow Chart Multiburner ...
Страница 80: ......
Страница 81: ......
Страница 82: ......