Quick Start Guide
Once you
have
installed your PG 1 where you need it, plug it in to an appropriate power
source. If you are not sure your source is correct, consult with your local power company.
Plug in your equipment to the correct outlets on the PG 1
.
Turn on the power
.
The digital and analog outlets are switched with a delay
sequence.
The
digital and analog outputs turn on with the power switch and turn o
ff after
a six second
delay.
The high current outputs turn on
after
six seconds and turn o
ff
with the power
switch.
This
allows any startup sequences to be
finished
before the high current devices are turned
on.
The front panel outlets are not switched and operate simultaneously with the power
switch.
Please refer to the detailed feature guide below for more
information.
ON/OFF Switch: Once the PG 1 is plugged into a grounded 115VAC outlet, turning the
front panel POWER switch to the ON posi
tion
will
sequentially
power the components
plugged into the rear panel
outlets.
GROUND OK: When this is on, the PG 1 is plugged into a properly grounded power
source.
If the LED is not on, unplug the unit from the power source and correct the
fault.
Wiring Fault: This indicates the LINE and NEUTRAL wires in the source are reverse
d.
Unplug the unit immediately and consult an electrician to
fix
the
fault.
Clean Power On: This LED indicates that the PG 1 is providing clean,
beautiful
AC power