MACCHI MC-200 -
Item code: BH104
.
Instruction Manual
14
When the stopper assembly is installed in the
tank, the top of the vent tube should rest just
below the top surface of the tank. It should not
touch the top of the tank.
3) Carefully bend the second nylon tube
up at a 45 degree angle (using a cigarette
lighter). This tube will be the vent tube to the
muffler.
4) Carefully bend the third nylon tube down
at a 45 degree angle (using a cigarette lighter).
This tube will be vent tube to the fueling valve.
1) The stopper has been pre-assembled
at the factory.
2) Using a modeling knife, cut one length
of silicon fuel line (the length of silicon fuel line
is calculated by how the weighted clunk should
rest about 8mm away from the rear of the tank
and move freely inside the tank). Connect one
INSTALLING THE STOPPER ASSEMBLY
FUEL TANK.
end of the line to the weighted clunk and the
other end to the nylon pick up tube in the stop-
per.
Throttle cable.
Содержание BH 104
Страница 9: ...9 MACCHI MC 200 Item code BH104 Instruction Manual BH 104...
Страница 10: ...MACCHI MC 200 Item code BH104 Instruction Manual 10 Secure 5 x 45mm...
Страница 21: ...21 MACCHI MC 200 Item code BH104 Instruction Manual Epoxy glue Elevator pushrod C A glue...
Страница 22: ...MACCHI MC 200 Item code BH104 Instruction Manual 22 2 x10mm Plastic part for pushrod C A glue Cut Secure Secure...