SUKHOI 31.
Instruction Manual
14
ELEVATOR CONTROL HORN INSTALLA-
TION.
Elevator control horn install as same as the
way of aileron control horn. Please see pic-
tures below.
5. When you are sure that everything is
aligned correctly, mix up a generous amount
of 30 minute epoxy. Apply a thin layer to the
top and bottom of the stabilizer mounting area
and to the stabilizer mounting platform sides
in the fuselage. Slide the stabilizer in place and
re-align. Double check all of your measure-
ments one more time before the epoxy cures.
Remove any excess epoxy using a paper
towel and rubbing alcohol and hold the stabi-
lizer in place with T-pins or masking tape.
6. After the epoxy has fully cured, re-
move
the masking tape or T-pins used to hold the
stabilizer in place and carefully inspect the
glue joints. Use more epoxy to fill in any
gaps that were not filled previously and
clean up the excess using a paper towel and
rubbing alcohol.
3. Mark the shape of the vertical on the left
and right sides onto the horizontal stabilizer
using a felt-tip pen
4. Remove the stabilizer. Using the lines
you just drew as a guide, carefully remove the
covering from between them using a modeling
knife.
When cutting through the covering to
remove it, cut with only enough pressure
to only cut through the covering it’s self.
Cutting into the balsa structure may
weaken it. This could lead to possible fail-
ure during flight
Pen.
Bottom side.
Remove covering.
Bottom side.
Epoxy glue.
C/A glue.
Содержание SUKHOI31
Страница 27: ...SUKHOI 31 INSTRUCTION MANUAL 27...