18
WEB-ENABLED INTERNET POWER SWITCH
Figure 3-2. The IPS Plug Status screen (Web interface).
3. Test switching functions: When the IPS is powered on, the switched AC outlet
is set in the On position. To test on/off/reboot functions, proceed as follows:
a) Reboot outlet: Click on the
Boot
button for plug 1. Next, click on the
Apply
button. The IPS displays a screen indicating that the reboot
operation is in progress, then returns to the Plug Status screen. Plug 1 is
now in the On position.
b) Switch outlet off: Click on the
Off
button for plug 1. Next, click on the
Apply
button. The IPS displays a screen indicating that the switch
operation is in progress, then returns to the Plug Status screen.
NOTE
The status indicator for plug 1 now indicates that the plug is
switched off.
c) Switch outlet on: Click on the
On
button for plug 1. Next, click on the
Apply
button. The IPS displays a screen indicating that the switch
operation is in progress, then returns to the Plug Status screen.
NOTE
The status indicator for plug 1 now indicates that the plug is
switched on.