5
CHAPTER 2: Installation
2.2 Connecting Power Switch Satellite Twin
1. Connect the supplied RJ9 link-up cable to the RJ9 Out connector of the Master and to the RJ9 In
connector of the Satellite.
To cascade several Satellites, link RJ9 Out connector to RJ9 In connector of the next satellite.
2. Allocate an address to each Satellite by positioning the address selection DIP-switches marked
Slct on the front panel according to the following table.
Remarks
- Unplug the device before changing its DIP switches.
- Do NOT use the same address for two different Satellites.
Satellite number
DIP-switch 1
DIP-switch 2
1
Off
Off
2
On
Off
3
Off
On
4
On
On
Position Off = switch upwards
Position On = switch downwards
Micro-switch 1 is on the left side, micro-switch 2 on the right.
3. Plug the 2 power cables into 2 grounded sockets. The A and B LEDs light on to confirm that
power is on.