17
CHAPTER 4: Installation
8. Plug the other end of the RS-232 cable into a
powered-down device whose serial communication
you want to extend.
9. Repeat steps 1 through 8 with the remote site’s
SHM-B Sync card.
10. Plug in both chassis and power up the RS-232
devices attached to each card. Your SHM-B Sync
system should begin operating right away. If the
LEDs on the cards’ front panels light up, do the
tests described in
Section 4.3
. If not, refer to the
first item in
Section 6.2
.
11. Repeat steps 1 through 10 for any other
communicating pairs of SHM-B Sync cards
you want to install in this pair of card chassis.
12. If all of your cards and attached devices seem to be
operating correctly, put the front panels of both
card chassis back on.
Содержание ME801-C
Страница 36: ...35 NOTES...