Page 14
724-746-5500 | blackbox.com
Chapter 3: System Installation
2. Lay the Ethermet cable into the core, usually within 2 to 3 inches of the
connector.
Figure 3-16. Putting cable into the core.
3. Loop the cable around and through the core. This helps “lock” the core in
place, and may be required in circumstances withe severe interference.
Figure 3-17. Loop cable around core.
Содержание LWE121A
Страница 35: ...Page 35 724 746 5500 blackbox com NOTES ...