
FEED-THROUGH CAT5E PATCH PANELS
3
Installation
Use the Feed-Through CAT5e Patch Panels with or without the cable-management bar. It neatly organizes and
supports the cables that are installed in rear of the patch panel.
Without using the cable-management bar:
1. Find an empty rack space on a relay rack or communications cabinet.
2. Install the panel with the supplied 10-32 or 12-24 cup-head screws.
3. Install the RJ-45 patch cables on the front and rear connectors to make the connections.
Using the cable-management bar:
1. Remove the two pan-head screws from each side of the patch panel.
2. Position the cable-management bar on the patch panel, and reinstall the two pan-head screws.
3. Install a patch cable in one of the panel’s rear ports. Unscrew the corresponding silver clip behind the
installed port, and position the patch cable under the silver bracket. Tighten the screw.
4. For a 48-port patch panel (JPM806A-R2 or JPM810A-R2), repeat steps 1 through 3 to install the second
cable-management bar.
Installation is complete.
Any trademarks mentioned in this manual are acknowledged to be the property of the trademark owners.