background image

2

TABLE OF CONTENTS

NEED HELP?

LEAVE THE TECH TO US

LIVE 24/7

TECHNICAL

SUPPORT

1.877.877.2269

1.877.877.2269

BLACKBOX.COM

1. SPECIFICATIONS ........................................................................................................................................................................... 3

2. OVERVIEW ...................................................................................................................................................................................... 4

2.1 Description ................................................................................................................................................................................................4
2.2 What’s Included ........................................................................................................................................................................................4
2.3 Part Numbers ...........................................................................................................................................................................................4

3. PRE-INSTALLATION ...................................................................................................................................................................... 5

3.1 STEP 1: Enclosure Mounting ...................................................................................................................................................................5

  STEP 1A: Optional Mounting Solutions ...................................................................................................................................................................6

3.2 STEP 2: Bulk Fiber Cable Entry ...............................................................................................................................................................8

4. INSTALLATION ............................................................................................................................................................................ 10

4.1 STEP 1: Mounting the Enclosure to the DIN Rail ..................................................................................................................................10
4.2 STEP 2: Cabling and Securing the Bulk Fiber to the Enclosure .........................................................................................................10
4.3 STEP 3: Terminating the Fiber Cable ....................................................................................................................................................11

 

Содержание JPM397A

Страница 1: ...24 7 TECHNICAL SUPPORT AT 1 877 877 2269 OR VISIT BLACKBOX COM DIN RAIL FIBER ENCLOSURE JPM397A JPM398A USER MANUAL...

Страница 2: ...scription 4 2 2 What s Included 4 2 3 Part Numbers 4 3 PRE INSTALLATION 5 3 1 STEP 1 Enclosure Mounting 5 STEP 1A Optional Mounting Solutions 6 3 2 STEP 2 Bulk Fiber Cable Entry 8 4 INSTALLATION 10 4...

Страница 3: ...5 31 W x 5 51 D 5 1 x 13 5 x 14 cm Weight 1 15 lb 0 52 kg Metal Thickness 18 gauge 1 0 mm Color Black Cable Grommet Range 4 0 mm to 8 0 mm Fiber Adapter Ports One TABLE 2 JPM397A SPECIFICATIONS SPECI...

Страница 4: ...LGX fiber adapter panels with a side door that uses thumbscrews for easy access inside of the enclosure There are also many DIN rail mounting options around the enclosure along with three bulk fiber p...

Страница 5: ...IN Rail Fiber Enclosures have several possible DIN rail mounting options that the user can select From the factory the DIN rail bracket is located on the rear of the enclosure see photo 2 screws on th...

Страница 6: ...IN Rail Fiber Enclosure has several other optional mounting solutions There is an optional Magnetic Bracket sold separately part number ACC MAGBRKT and an L shaped Adapter bracket included with the DI...

Страница 7: ...your DIN Rail Fiber Enclosure CAUTION Always use care when handling Follow the precautions listed below Always wear safety goggles when handling large magnets Always wear gloves when handling magnets...

Страница 8: ...l points of entry where the incoming bulk fiber cable can enter the enclosure From the factory the point of entry is located at the bottom of the enclosure and the other access points are plugged The...

Страница 9: ...he fiber point of entry 1 Loosen the grommet nut and remove the angled bracket 2 Find the new entry point and remove the plug cap and re install the angled bracket 3 Be sure to secure the angled brack...

Страница 10: ...RE Now that the enclosure is firmly mounted to the wall you can finish the installation 1 Remove the two screws on the Kevlar clamp and remove the large grommet nut outside the enclosure NOTE Do this...

Страница 11: ...of the enclosure The DIN Rail Fiber Enclosure accepts only LGX style fiber adapter panels 1 Install your LGX fiber adapter panel 2 Begin to individually terminate each fiber strand Make sure that you...

Страница 12: ...12 1 877 877 2269 BLACKBOX COM NEED HELP LEAVE THE TECH TO US LIVE 24 7 TECHNICAL SUPPORT 1 877 877 2269 CHAPTER 4 INSTALLATION FIGURE 4 3 FIBER CABLE TERMINATED...

Страница 13: ..._________________________________________________________ __________________________________________________________________________________________________ ___________________________________________...

Страница 14: ..._______________________________________________________ __________________________________________________________________________________________________ _____________________________________________...

Страница 15: ..._____ ________________________________________________________________________________________________ _________________________________________________________________________________________________...

Страница 16: ...NEED HELP LEAVE THE TECH TO US LIVE 24 7 TECHNICAL SUPPORT 1 877 877 2269 COPYRIGHT 2018 BLACK BOX CORPORATION ALL RIGHTS RESERVED JPM397A_JPM398A_USER_REV2 PDF...

Отзывы: