724-746-5500 | blackbox.com
724-746-5500 | blackbox.com
724-746-5500 | blackbox.com
ServSwitch DKM Quick Start Guide
ServSwitch DKM Quick Start Guide
ServSwitch DKM Quick Start Guide
Page 3
Page 2
Page 4
• (1) country-specific power cord
• This printed Quick Start Guide
The Single-Head devices also include:
• DVI video cable (6 ft. [1.8 m], DVI-D, male to male)
Figure 1-1. DVI video cable.
• (1) USB cable (6 ft. [1.8 m], Type A to Type B)
Figure 1-2. USB cable.
The Dual-Head devices also include:
• DVI video cable (6 ft. [1.8 m], DVI-D male to male)
Figure 1-3. DVI cable.
• USB cable (6 ft. [1.8 m], Type A to Type B)
Figure 1-4. USB cable.
The Analog Audio/Serial option also includes:
• Serial cable (6 ft. [1.8 m], RS-232 male connector)
Figure 1-5. Serial cable.
• Stereo jack cable (5.2 ft. [1.6 m], 3.5-mm male
connector)
Figure 1-6. Stereo jack cable.
ACX1T
ACX1T
ACX1T
The Digital Audio option also includes:
• RCA cable (8.2 ft. [2.5 m], Cinch male connector)
Figure 1-7. RCA cable.
• TOSLINK
®
cable (6 ft. [1.8 m], F05 male connector)
Figure 1-8. TOSLINK cable.
The USB-HID Add-on option also includes:
• USB cable (6 ft. [1.8 m], USB Type A to Type B)
Figure 1-9. USB cable.
The USB 2.0 Add-on option also includes:
• USB cable (6 ft. [1.8 m], USB Type A to Type B)
Figure 1-10. USB cable.
The VGA option also includes (instead of DVI-D):
• VGA cable (6 ft. [1.8 m], VGA male to DVI-I male)
Figure 1-11. USB cable.
• Infrared remote control
2. System Setup
NOTE: If you are a first-time user, we recommend that
you set up the system as a test setup. This will
enable you to identify and solve any cabling
problems, and experiment with your system
more conveniently.
1. Switch off all devices.
CON Unit installation
2. Connect your monitor(s), keyboard and mouse to
the CON Unit.
3. Connect the CON Unit with the interconnect
cable(s).
4. Connect the 5-VDC power supply to the CON Unit.
CPU Unit Installation
5. Connect the source (computer, CPU) with the
supplied cables to the CPU Unit. Make sure the
cables are not strained.
6. Connect the CPU Unit to the interconnect cable(s).
7. Connect the 5-VDC power supply to the CPU Unit.
8. Power up the system.
NOTE: To power up the system, we recommend the
following sequence: Monitor – CON Unit – CPU
Unit – source.
3. System Overview
1 2 3 4
5
Figure 3-1. System components.