7 TRIM FLANGE ATTACHMENT
Position Flange (
7A
) on Valve (
7B
) with Drain Hole (
7C
) at the bottom. Place
Protective Washer (
7D
) on the short end of the reversible Retainer Sleeve (
7E
).
Screw Retainer Sleeve (
7E
) onto threaded section of the Stem and Bonnet (
7G
).
Tighten Retainer Sleeve (
7E
) by hand until Flange (
7A
) is snug to finished wall
surface. If the short end of the Retainer Sleeve (
7E
) is too short, reverse it to
use the longer end.
8 HANDLE ATTACHMENT
Place Handle Hub (
8A
) onto the Valve Stem (
8B
) and secure with Set Screw (
8C
).
Attach Decorative Button (
8D
) over screw access hole and press firmly.
10 SPOUT INSTALLATION
Apply PTFE plumber's tape on both ends of Pipe Nipple (
10A
) (not included).
Screw Pipe Nipple (
10A
) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Nipple (
10A
) is to project 3
7
/
8
" to 4" from the finished wall.
Screw Tub Spout (
10B
) onto Pipe Nipple (
10A
) and tighten until Spout is properly
positioned and flush to the finished wall.
11 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
9 SHOWER ARM INSTALLATION
Insert the long end of Shower Arm (
9A
) through the Shower Flange (
9B
).
Apply PTFE plumber's tape to both ends of Shower Arm (
9A
) according to
manufacturer's instructions. Screw long end of Shower Arm (
9A
) into pipe elbow
inside the wall. Slide Shower Flange (
9B
) tight to the wall.
7
8
11
9
10
3
ENGLISH
7A
7B
7C
7C
7D
7E
7G
8A
8B
8D
8C
9A
9B
10A
3
7
/8” to 4”
10B