Operating instruction EC II
About the device
2 − 5
6.107.98.5.01.44
2.8
Operating conditions
Do not install or commission equipment until the operating conditions have been fulfilled.
−
Temperature and air humidity:
The permitted values and class of protection are found on the designation label on the
device and on page 2 − 2.
−
Installation area
A flat, vibration−free position as well as the driest possible installation must be
guaranteed for our equipment.
Vibrations can affect measurements made by the scales.
−
Align horizontally
To ensure the precision of the sales, it is of absolute necessity that the device is aligned
horizontally.
−
Draft
Drafts can affect the measurements made by the scales.
−
Air convection
Free air convection must be able to form around the device in order to avoid inadmissible
heating.
−
Supply voltage
The permitted values can be found on the designation label on the device −
and see page 10 − 2.
−
Trained personnel:
Only trained personnel can maximize the performance of the device and avoid risks.
−
Written consent for modifications:
Modifications to the devices require our prior written consent. External data dialog
between Bizerba equipment and other manufacturers’ equipment, the hardware and
software required, test and modification work, must be clarified with us in writing.
Please contact us or our competent customer service points if you have any doubts regarding
the practical application of these conditions.
For other manufacturers’ equipment included in our scope of supply, the respective
manufacturer’s regulations take preference if they deviate from our conditions.
2
Содержание EC II 100
Страница 4: ...6 107 98 5 01 44...
Страница 8: ...Operating instruction EC II List of contents 0 4 6 107 98 5 01 44...
Страница 12: ...Operating instruction EC II About these instructions 1 4 6 107 98 5 01 44 1...
Страница 20: ...Operating instruction EC II About the device 2 8 6 107 98 5 01 44 2...
Страница 36: ...Operating instruction EC II Installation 4 14 6 107 98 5 01 44 4...
Страница 40: ...Operating instruction EC II Device and operating controls 5 4 6 107 98 5 01 44 5...
Страница 50: ...Operating instruction EC II Operation 6 10 6 107 98 5 01 44 6...
Страница 72: ...Operating instruction EC II Maintenance 9 2 6 107 98 5 01 44 9...
Страница 77: ...Operating instruction EC II Appendix 6 107 98 5 01 44 Appendix Declaration of Conformity...
Страница 78: ...Operating instruction EC II Appendix 6 107 98 5 01 44...
Страница 80: ...6 107 98 5 01 44...
Страница 81: ......