1.

   Position the 

Vertical Pole

 (A) taking into consideration that the 

BA47U/BA47A

 

Backboard

 (I) will be 

approximately 5’ from the front of the 

Vertical Pole

 (A). Dig a 12” minimum diameter by 48” deep 

hole. It is advisable to bell out the bottom of the hole about 4” larger in diameter. A larger diameter hole 

is always better than a hole that is not large enough. If you are installing in loose, sandy or otherwise 

non compacted soil increase hole diameter to at least 24”.  

Never

 install using Sonotubes. Pole must be 

installed in the center of the concrete footings to avoid footing failure. 

 

2.

   Make sure that you have the following tools available prior to pouring the concrete footing: a level, a 

broomstick or similar pole, bracing materials, and a tape measure.  If you have made your hole larger 

than 12” diameter x 48” deep, than you will require more concrete.  Having enough concrete before you 

start will ensure proper strength of the footing. 

 

3.

   Mix concrete according to instructions on the bag.  It is advantageous to have the mixture be “wet”.  

This will increase your working time and allow the batches to mix in the hole.  Pour the hole full to 

ground level.  Insert the broomstick into the wet concrete and agitate up and down, REPEAT 

SEVERAL TIMES. Insert the 

Vertical Pole

 (A) into the concrete while continuing to agitate broomstick 

to ensure the mixture fills in good around the 

Vertical Pole

 (A).  Make sure that at least 100” of pole 

extends above desired playing surface to ensure official 10’-0” playing height. (Approximately to decal 

on pole, 

see illustration

.) Clean excess concrete off of the 

Vertical Pole 

(A) with a damp towel and 

smooth the top of the footing. Level the 

Vertical Pole

 (A) and apply bracing materials to support while 

concrete cures. 

 

4.

   Install 4 (four) 

Spring Pins

 (H) in 

Mounting Plate

 (C) so that they are flush with the back side of the 

Mounting Plate 

(C).  Install 4 (four) 

Spring Pins

 (H) in the 

Mounting Plate

 (C) on the 

Extension Arm

 

(B) with the 

Spring Pins

 (H) flush to the 

BA47U/BA47A Backboard

 (I) side. These 

Spring Pins

 (H) are 

essential to the alignment of the 

Extension Arm

 (B) to the 

Vertical Pole

 (A). Spring pins will be pre-

installed in “Hot-Dip” Galvanized poles. 

 

5.

   After allowing 48 hours curing time for the concrete, mount the 

Extension Arm

 (B) as shown using 

hardware provided.  The 

Extension Arm

 (B) can be loosely mounted at the ground level and raised to 

correct height depending on equipment availability. 

 

WARNING!  EXTENSION ARM IS EXTREMELY HEAVY!  STAY AWAY FROM THE AREA 

BELOW THE EXTENSION ARM/BACKBOARD WHILE INSTALLING OR ADJUSTING. 

SERIOUS INJURY OR DEATH MAY OCCUR.

 

 

6.

   Install the 

Model BA47U/BA47A Backboard

 (I) over the top lip on the 

Extension Arm

 (B) and attach the 

BA47U/BA47A Backboard

 (I) to arm with the 7/16” hardware provided (L)(M)(N)(O). Finger tighten 

only. 

 

7.

   Install the 

Model BA39U Rim

 (J) using the hardware provided with it.  

 

8.

   Tighten all bolts making sure the 

Model BA39U

 

Rim

 (J) is at the desired height. 

 

9.  

Install the 

Pole Cap

 (P). 

 

10. 

To eliminate possible loosening of the extension arm bolts by vandals, which could cause serious injury   

or death, distort the thread on the six 

5/8” x 8” Hex Bolts 

(D) with a chisel and hammer  

Отзывы: