8320
Series
Tenuline®
Attenuator
18
12. Refill
the
coolant
chamber
to
the
levels
shown
in
.
13. Install
the
output
end
cover.
See
Replace RF Assembly
To
replace
the
RF
Assembly
follow
the
steps
in
.
The
RF
Assembly
does
not
contain
any
replaceable
components
and
must
be
replaced
in
its
entirety,
see
.
Coolant Level Inspection
The
level
of
the
dielectric
coolant,
P/N
5
‐
030,
should
remain
constant
in
the
unit
even
after
prolonged
usage
under
normal
operating
conditions.
However,
loss
of
up
to
10
percent
of
the
full
tank
capacity
should
not
impair
the
operating
efficiency
of
the
attenuator.
Model 8325 Coolant Level Check
Note:
The
Model
8325
coolant
level
may
be
check
without
disassembling
the
attenuator
using
this
procedure,
if
the
unit
is
already
partially
disassembled,
check
the
coolant
level
using
the
.
1.
Remove
RF
Power
and
allow
attenuator
to
cool
to
room
temperature.
2.
With
Attenuator
in
horizontal
position
remove
Vent
or
Shipping
Plug
from
expansion
tank.
3.
Verify
coolant
level
is
approximately
1/8
inch
(3.2
mm)
deep
within
the
expansion
tank.
Add
coolant
if
the
coolant
is
not
visible
in
the
tank
or
depth
is
less
than
1/8
inch
(3.2
mm).
All Models Coolant Level Check
4.
Remove
the
output
end
cover.
See
Measure
the
level
of
the
coolant,
see
.
(Model
8321,
8322,
8323)
The
coolant
should
be
about
7/8
inch
(22.2
mm)
below
the
face
of
the
output
end,
with
the
unit
in
a
vertical
position.
The
coolant
should
just
cover
the
upper
surface
of
the
cubical
center
block
of
the
RF
section
assembly.
(Model
8325)
Coolant
should
nearly
fill
the
entire
coolant
tank,
the
external
expansion
tank
will
provide
room
for
expansion
during
operation.