
english
32
4. Montage
4.1 Flushing out the heating system (with pump removed)
In order to avoid undesirable interruptions in operation
and non-starting of the pump after long periods of standstill,
it is recommended for a newly-installed or converted heating system
that the system be drained, flushed through well and then refilled
again after heating up for the first time.
4.2 Antifreeze
(where necessary)
Important:
Rinse the piping especially thoroughly before filling
with the antifreeze mixture. Follow the instructions
of the supplier of the antifreeze concerning mixing, filling,
and the selection of materials in the line and device network
(mind the corrosion protection!).
The water / glycol mixture may contain up to 50% glycol.
Correct the flow data for the pumps accordingly if there
is more than 10% glycol.
4.3 Installation
Only install after all of the welding and soldering has been
done on the system.
Prevent water from dripping on the pump motor,
especially the electronics.
Install the pump casing into the unit when not under voltage.
4.4 Installation position
Delivery state is Position
A
The terminal box can be
turned through 90° before
installing the pump.
For this purpose the
4 housing screws can be
released and the motor
head turned to the permitted
terminal box position.
Do not displace or damage
the seal between motor
and pump housing.
After inserting the screws
tighten
crosswise alternately.
A
961336_00
B
C
D
The terminal box may only
be arranged in the positions
shown.
The arrows indicate the
permitted flow directions.
Note:
The two pumps alternate in their operation.
The switchover from one pump to the other takes place once
every 24 operating hours.
A 802, A 1002
AD 802
A
P2
P1
P2
P1
P2
P1
C
B
961337_00
D
P2
P1
Содержание A 1002
Страница 94: ...8 108 8 1 108 8 2 108 8 3 0 10 109 8 4 109 8 5 109 9 109 10 111 11 113 11 1 113 11 2 113 12 114 13 114 94...
Страница 95: ...DIN 4844 W8 DIN 4844 W9 1 1 1 1 2 1 3 1 4 95...
Страница 96: ...1 5 1 6 NIN CENELEC 1 7 1 8 1 9 96 2...
Страница 99: ...99 961338_00 4 5 961339_00 1 2 1 2...
Страница 100: ...100 4 7 75 C 0 6 95 C 1 0 110 C 1 7 500 0 01 100 95 C 0 45 110 C 1 10 961340_00 4 6 7 2...
Страница 103: ...103 5 8 6 3 A2 7 2 6 6 1 4 6 2 0 2...
Страница 104: ...104 6 4 Biral 6 4 1 A AD 1 10 2 L N 3 L N 4 L 1000 1500 L N 20 5 L N 6 L N 7 6 4 2 A 802 AD 802 A 1002 6 4 1...
Страница 105: ...105 7 1 A1 A1 2 A3 7 5 R100 3 R100 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 7...
Страница 106: ...106 2 1 6 2 3 4 7 2 A1 7 3 A2 3 3 7 4 H V 3 A 802 11 5 75 A 1002 11 5 75 AD 802 11 5 75 1P 105 2P...
Страница 107: ...107 t t 7 5 A3 7 6 A 802 A 1002 AD 802 A 802 KW A 1002 KW AD 802 KW 6 6 3 3 24...
Страница 108: ...108 8 8 1 R100 7 3 8 2 7 8 c R100...
Страница 109: ...109 8 3 0 10 0 10 5 6 2 1 2 3 4 8 4 1 2 3 4 1 3 4 2 3 4 3 4 5 0 10 5 6...
Страница 110: ...110 8 5 R100 R100 R100 R100 R100 9...
Страница 111: ...111 FI 1 2 1 R100 2 R100 3 3 4 4 R100 4 10 10 7 5...
Страница 112: ...112 Biral 7 3 6 2 12 7 3 6 2...
Страница 113: ...113 11 11 1 11 2 15 C 110 C B2 DIN 4102 A 802 WD 9 A 1002 WD 10...
Страница 115: ......