EN - 12
BAL.0028 • 2017-03-10
6 Commissioning
BRS-FP/BRS-FPi
6.1 Connecting the pneumatic system
The BRS-FP/BRS-FPi uses cleaned and lubricated compressed air, which is supplied to the integrated
distributor block by means of a maintenance unit.
The supply line required for this purpose has a minimum inner width of 8 mm and is not included in the scope
of delivery.
NOTICE
• Please take note of the following instructions:
2 Safety on page EN-5
• The system must only be installed and put into operation by qualified personnel
(in Germany, see TRBS 1203).
• Make sure that the cleaning process is not impaired by the collecting tray and the bottle holder.
1
PCB
2
Compressed air line for motor
3
Silencer
4
Pneumatic connection
5
Electrical connection
6
Support (optional)
7
Covering hood
Fig. 4
Commissioning
200
60
6
5
4
3
2
1
7
WARNING
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• The torch cleaning station must remain without pressure until installation is complete.
NOTICE
• The cleaning capacity of the torch cleaning station depends on operating pressure, number of
revolutions of the motor and atomization of the anti-spatter fluid. Determine the most favorable
adjustment in a test run.
Содержание BRS-FP
Страница 4: ...DE 4 BAL 0028 2017 03 10 1 Identifikation BRS FP BRS FPi ...
Страница 16: ...DE 16 BAL 0028 2017 03 10 6 Inbetriebnahme BRS FP BRS FPi Abb 7 Verdrahtungsplan ...
Страница 28: ...EN 4 BAL 0028 2017 03 10 1 Identification BRS FP BRS FPi ...
Страница 39: ...BRS FP BRS FPi 6 Commissioning BAL 0028 2017 03 10 EN 15 Fig 7 Circuit diagram ...
Страница 49: ...BRS FP BRS FPi Notes BAL 0028 2017 03 10 EN 25 Notes ...
Страница 52: ...DE 4 BAL 0028 2017 03 10 1 Identification BRS FP BRS FPi ...
Страница 64: ...DE 16 BAL 0028 2017 03 10 6 Mise en service BRS FP BRS FPi Fig 7 Schéma de connexion ...
Страница 76: ...ES 4 BAL 0028 2017 03 10 1 Identificación BRS FP BRS FPi ...
Страница 88: ...ES 16 BAL 0028 2017 03 10 6 Puesta en servicio BRS FP BRS FPi Fig 7 Esquema de conexiones ...
Страница 99: ...BRS FP BRS FPi Notas BAL 0028 2017 03 10 ES 27 Notas ...