77-2985-R0.5
7/38
EN
Binks GEMS Monthly Inspection
Description
Inspection
Completed By
Date
Examine oil reservoir
Visual
Check all hoses for kinks and wear
Visual
Perform flow meter calibration check
Test with Beaker
Check static mixer for clogs
Disassemble
Check CCV operation. Remove valves
and clean.
Disassemble
Clean flow meter
Disassemble
Clean mix manifold and check valves
Disassemble
Check fluid hoses for material buildup
Disassemble
Binks GEMS As Needed Inspection
Description
Inspection
Method
Completed By
Date
Clean and rebuild injector assembly
Disassemble
Clean and rebuild B pump
Disassemble
Rebuild color change valves
Disassemble
Set B pump limits
Visual
2.2: Maintenance Schedule
Binks GEMS Daily Inspection
Description
Inspection
Completed By Date
System flushed with solvent
Visual
Check for leaks
Visual
Clean spray guns
Visual
Check alarm history
Visual
Check material supply
Visual
Содержание GEMS
Страница 16: ...16 38 77 2985 R0 5 EN 6 Color Stack 5 Color 240 3230 5 Thread Sealant ...
Страница 22: ...22 38 77 2985 R0 5 EN ...
Страница 31: ...77 2985 R0 5 31 38 EN 17 1 Electrical Diagrams ...
Страница 32: ...32 38 77 2985 R0 5 EN ...
Страница 33: ...77 2985 R0 5 33 38 EN ...
Страница 34: ...34 38 77 2985 R0 5 EN ...
Страница 35: ...77 2985 R0 5 35 38 EN ...