5
CHAPTER 3. MECHANICAL INSTALLATION
GUIDELINES
The probe can be mounted on the side of the vessel horizontally, or on the top of the vessel vertically.
The probe should be located out of the direct flow of material into the vessel.
MOUNTING
Consult the appropriate dimensional drawing in the Appendix for mounting information related to the
model ordered.