CB (E7) 06/2018
Page 138/174
Recommended precautions: To protect the eyes use sealed protective goggles.
CAUTION
Eye contact.
Eye damage due to chemical burns.
∅
Do NOT empty into drains.
Wear protective goggles.
Following frequent use of the disinfectant spray and prior to hot-air sterilization, remove any
agent remainder by using the neutral cleaning agent and then a moistened towel to avoid
formation of permanent residues.
After using the disinfectant spray, allow the chamber to dry thoroughly, and aerate it
sufficiently.
21.3 Hot-air sterilization at 180 °C / 356 °F
The very first sterilization after operation may cause an odor. This is not a quality defect. We
recommend ventilating well the room during sterilization.
21.3.1 Overview
Heating up
Holding
Cooling down
Equilibrating
4 hours
6 hours
unlimited
Sterilization cycle of 10 hours
Figure 29: Setpoint profile during the sterilization cycle
The chamber can perform an automatically controlled hot-air sterilization cycle. This procedure will take
approx. 10 hours and consists of the following steps:
•
Heating up phase:
The chamber heats up the inner chamber as fast as possible to the sterilization
setpoint temperature
•
Holding phase:
Constant sterilization setpoint temperature
The sterilization setpoint temperature is pre-set in factory to 187.5 °C /
369.5 °F
. The duration of the
heating up and holding phase is in total 4 hours. This ensures that 180 °C /
356 °F
is maintained on all
internal surfaces for at least 30 minutes
•
Cooling down phase:
Programmed duration of 6 hours until 37 °C /
98.6°F
is reached
•
Then follows an
equilibration phase:
After the 10-hour sterilization cycle the controller changes to
fixed value operation mode and equilibrates to the set-point which has been entered there (e.g., 37 °C
/
98.6 °F
).
37 °C
187.5 °C
Содержание CB 170
Страница 165: ...CB E7 06 2018 Page 165 174 25 9 Dimensions CB 170 Dimensions in mm...
Страница 166: ...CB E7 06 2018 Page 166 174 26 Certificates and declarations of conformity 26 1 EU Declaration of conformity...
Страница 167: ...CB E7 06 2018 Page 167 174...
Страница 168: ...CB E7 06 2018 Page 168 174 27 Product registration...
Страница 175: ......