background image

 

 

BIJUR DELIMON INTERNATIONAL 

BA_2017_1_GB_PVB

 

 
 
 
 
 
 
 
 
 
 
 
 

Operating manual 

Progressive Block 
Distributor PVB 

BA_2017_1_GB_PVB

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

Содержание PVB series

Страница 1: ...1 BIJUR DELIMON INTERNATIONAL BA_2017_1_GB_PVB Operating manual Progressive Block Distributor PVB BA_2017_1_GB_PVB...

Страница 2: ...ion for competition purposes Company address spare parts and service address DELIMON GmbH Arminstra e 15 D 40277 D sseldorf Phone 49 211 7774 0 Fax 49 211 7774 210 Branch office Am Bockwald 4 D 08344...

Страница 3: ...has to take care that all the maintenance inspection and installation work is executed by authorized and qualified skilled personnel who have informed themselves adequately by thoroughly studying the...

Страница 4: ...ND FUNCTION PVB distributors are piston distributors which evenly distribute the supplied lubricant This is achieved by means of metal sealing pistons which dispense the lubricant to the connected lub...

Страница 5: ...outlets or outlets that are opposite each other in order to achieve a higher metered volume for individual outlets for example WARNING Special fittings with non return valves similar to DIN 2353 CLL...

Страница 6: ...modification of the outlets is listed in Chapter 9 Accessories Monitoring The PVB distributor can be fitted with a motion indicator on the last outlet pair for visually monitoring the piston movement...

Страница 7: ...valves Suitable lubricants based on mineral oil Grease NLGI class 000 to 2 DIN 51818 Oil ISO VG 68 to 1500 operating viscosity DIN 51519 Synthetic lubricants on request The NLGI class as per DIN 5181...

Страница 8: ...reversal yes Supply line short circuit protection no Circuit diagram and dimensions Electrical monitoring 76925N018 pressure resistant version 350 bar Type of protection IP 67 Operating voltage 10 to...

Страница 9: ...ght connection open E right outlet open left closed CA c left connection open F both outlets closed CC c connections open on both sides G both outlets closed BC b connection and c right connection ope...

Страница 10: ...factor is only the pumping capacity and its distribution over the PVB distributor as the following example shows Pumping capacity 12 cm3 min Distributor configuration 1 3 x 0 4 cm3 Distributor config...

Страница 11: ...lubrication quantity over several intervals e g 2x per hour Further details on the mode of operation and control of progressive systems can be found in the general description of the system We are ha...

Страница 12: ...ding 03 has to order separately if stainless steel of plug in fittings is required The number of fittings depends on the number of outlet selection not suitable for 350 bar version Assembly anf fittin...

Страница 13: ...e used to assemble the pipelines and cutting ring fittings Please contact our service department if necessary We can provide service engineers or supervisors for assembly training and induction either...

Страница 14: ...oning o Ensure that the distributor and all the connected pipes are correctly installed before you operate the distributor and lubrication system o Ensure that the pump that is connected cannot exceed...

Страница 15: ...ting procedure 1 Make sure that the pump is supplying lubricant Remove the inlet fitting on the PVB distributor and let the pump run until lubricant comes out of the open line If there is no supply of...

Страница 16: ...type Application FZ A or FZ B Pump three phase motor 8 15 30 litre container up to 200 bar up to 12 outlets robust design for harsh industrial environment for specific requirements for motors power s...

Отзывы: