47
E:
On the outside of the assembly place 1 (1941) Water Sand Support overlapping Brookridge Tarp by 1” and
flush to the outside edges of both (1931) Posts. Make sure the board is level then attach with 4 (S3) #8 x 2-1/2”
Wood Screws. (fig. 28.3)
F:
Attach (2028) Cafe Top tight to the top of (1941) Water Sand Support with 3 (S7) #12 x 2” Pan Screws. Make
sure the notched edges are tight to the posts, . (fig. 28.3)
G:
From the inside of the assembly and 1/2” in from the edge of the tarp, attach tarp to (2036) Cafe Ground and
(1941) Water Sand Support with 4 evenly spaced (S5) #8 x 1/2” Pan Screws (with #8 flat washer) per board. The
distance between screws should be 8”. (fig. 28.4)
H:
Tighen the previously loosened bolts.
Wood Parts
Hardware
Step 28: Cafe Wall Assembly
Part 2
4 x
#8 x 2-1/2” Wood Screw
8 x
#8 x 1/2” Pan Screw (#8 flat washer)
3 x
#12 x 2” Pan Screw
S3
1 x
Cafe Top 5/4 x 4 x 35-7/8”
1 x
Water Sand Support 2 x 2 x 35-7/8”
2028
1941
S7
S5
Fig. 28.3
1931
Outside Fort View
Fig. 28.4
S7
2028
2036
1931
1941
15”
S3
S3
2036
1941
S5
8”
8”
8”
Inside Fort View
S5
Содержание F23210
Страница 54: ...54 support cedarsummitplay com NOTES NOTES...
Страница 55: ...55 support cedarsummitplay com NOTES NOTES...