![BIFFI OLGAS Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/biffi/olgas/olgas_installation-operation-and-maintenance-manual_2749513019.webp)
Installation, Operation and Maintenance Manual
MAN 608 Rev. 5
December 2020
Installation
15
Section 2: Installation
2.7
Commissioning
!
WARNING
Installation, commissioning and maintenance and repair works should be made by
qualified staff. Any calibration relative to functional aspects of the actuator are preset at
the factory. Before any modifications please contact Biffi Italia s.r.l.
Upon actuator commissioning please carry out the following checks:
•
Check that the values of hydraulic supply available in the system are compatible
with those reported on the identification plate of the actuator (Figure 1) and on
the documentation supplied.
•
Check the power voltage of electrical components complies with the one
reported on the documentation supplied and with specific data-plate placed on
electrical components.
•
Check the absence of leakages in the cylinder and in hydraulic connections.
•
Check that paint is intact and in case renovate it according to the specification on
order confirmation.
•
Carry out all kinds of operations and check their proper execution (Section 3.3).
•
Make a complete functional test in order to verify all the operations are executed
according to operating schematic diagram supplied.
NOTICE
if necessary to mount components not in Biffi scope of supply, please check the accessories
mounting hole details in the documents TN 1028 ( for metric dimension) or TN 1028U
(for imperial dimension).