Manufacturing & Service: Bierer & Associates Inc.
HP72
HI POT Meter
Operating Instructions
Страница 1: ...Manufacturing Service Bierer Associates Inc HP72 HI POT Meter Operating Instructions...
Страница 2: ...d the control of Bierer Associates Inc Bierer Associates Inc do not express or imply to be an insurer of these risks and by purchasing or using this product you AGREE TO ACCEPT THESE RISKS IN NO EVENT...
Страница 3: ...or other electrical test points Zero Ohm insulated adapters 81280IE should be used if limit mark will be exceeded 4 This equipment should be used only by qualified employees trained in and familiar wi...
Страница 4: ...and test operate off of a 9volt battery located in the meter housing The meter will still operate with a dead battery but the light and test functions will not BATTERY REPLACEMENT The threaded live l...
Страница 5: ...Following standard operating procedures isolate both ends of the cable to be tested using a feed thru bushing at transformer see NOTE 1 2 Attach Meter Second probe to appropriate length live line too...
Страница 6: ...e meter will read within the red area 7 A pulsating meter reading indicates the presence of an internal flashover 8 Discharge cable to ground after each test by contacting tested cable with Meter prob...
Страница 7: ...___________________________________________________ ______________________________________________________ ______________________________________________________ ______________________________________...