37
5.1.7 Menu ‘Payment system’
Protocol
Selection of Pay
sytem
(Up-Down
Scroll
menu)
Parallel
Enable Parallel validator
Executive
Enable executive system
ECS diff.
Enable differentiated ECS
Price Holding
Enable Price Holding
MDB
Enable MDB system
Credit timeout
Management credit
timeout before going in
overpay
[0…180s]
Multivend Enable
multisale [On/Off].
If ON the credit remains permanentemen-
tly on the display by-passing the preset
timeout . If off the credit timeout is ma-
naged.
Price timeout
Timeout price (only for ECS
or price holding) [2.0÷25.0 s]
Decimal point
Decimal point [00000,
0000.0, 000.00, 00.000] Only for Parallel
protocol
Management Exact Change :
Mmax - Pmin < Cgett then I have no change and distributor in Exact Change
Mmax - Pmin > Cgett then I have change therefore distributor in Insert
amount
where
Mmax = coin Max enabled
Pmin = Price Min of the price table
Cgett = Value of coins in system
If,by selecting the Validator, the distributor is always in Exact Change
If MDB has the following menus:
Maximum change
Maximum change processed by he system
[0÷9999]
Coin changer
It activates the change lever [Yes/No]
Maxi. coins credit
Maximum credit accepted by the system
[0÷65535]
Max cred. on key . Maximum credit that can be loaded on the
key [0÷65535]
Ignore ExChg
Ignore the coin inhibitions if in ‘exact change’
[Si/No]
Immediate change Enable preparation of instantaneous change
[On/Off] Priority on Multisale.
Min Lev tube 1 X
Select the minimum H2 0 Volume in the tube
1 [1…20]
Min level tube 2 X Select the minimum H2 0 Volume in the tube
2 [1…20]
Min level tube 3 X Select the minimum H2 0 Volume in the tube
3 [1…20]
Min level tube 4 X Select the minimum quantità in the tube 4
[1…20]
Min level tubo 5 X
Select the minimum H2 0 Volume in the tube
tube 5 [1…20]
Enab. TOKEN
Enable TOKEN [On/Off]
Token
Setting of the value of Token1[000.00÷999
.99]Enabled only if Enab.Token On
Token 2
Setting of the value of Token 2 [000.00÷999.99]
Enabled only if Enabl. Token On
Token 3
Setting of the value of Token 3 [000.00÷999.99]
Enabled only if Abil. Token On
Change x Token
Enables change if the value of token is > than
selection [Y/N] Enabled only if Enabl. Token
On
Re-charhe Token
Enables the re-load of the value of the token on
the key [Y/N] Enabled only if Enab. Token On
Ex.Chg. & Token Inhibit the acceptance of token when the machine
is in Exact Change [Y/N] Enabled only if Enab.
Token On
.
5.1.6 Menu ‘Times and thresholds”
Pump timeout Pump timeout
[0÷90
s]
Timeout charge Timeout water
charge [5÷240 s] Charge time out linked
to Water Entry EV in DC in case of A/R
distributor , o to the immersion pump in
case of S/A distributor.
T-out motors slave X
Timeout spiral
motors BVM600 [0÷25.0 s] . The wording
Slave X indicates the number of slaves
linked to the MASTER distributor. It is
managed only by WinBianchi.
Grinder timeout
Grinder timeout
[0÷25.5 s]
Group timeout
Timeout group
[0÷10.0 s]
Grinder threshold
T h r e s h o l d t o r e a d
g r i n d e r c u r r e n t
[5.0÷18.0]
Coffee time
Coffee preparation time
[2.9÷23.0 s]. L i n k e d
to automatic grinding.
T cleaning
Time cleaning water
[0÷25.5 s] – Only for
setting Cleaning and
Cleaning Cycle.
T. clean. cool
Water time cool clea-
ning [0÷25.5 s] Algo-
rithm changeable only
by WinBianchi.
H
2
O coffee inf.
Time water coffe inf [0÷25.5 s] Only for
models Fresh Brew
H
2
0 tea inf.
Time water tea inf [0÷25.5 s] Only for models
Fresh Brew
Coffe infusion
Coffee infusion time [0÷25.5 s] Only for
models Fresh Brew
Tea infusion
Tea infusion time[0÷25.5 s] Only for models
Fresh Brew
Bitter Comp.
Bitter compensation time[0÷10.0 s] Only for
Fresh Brew
Water init
Time water integration [0÷6.0 s] Only for po-
lisulphone boilers. If in D.A. through this type
of boiler drinks are performed in an interval
lower than 4 minutes one from the other,
when the pump starts, the amount of water
required by the integration setting is loaded
from the water input electrovalve . Input cool
water is mixed with hot water in the boiler to
avoid air bubbles in the water circuit which
would cause unsteadiness for doses. This
is the reason why the correct combinations
should be found between water integration
time and desired drink temperature in the
cup.
Содержание BVM951
Страница 1: ...BVM971 BVM951 CERT N 9105 BNVD UNI EN ISO 9001 2000 USE AND MAINTENANCE MANUAL...
Страница 2: ......
Страница 4: ......
Страница 56: ...56 6 8 1 BVM951 INSTANT Version HOT COLD Selection BVM951 Instant H C Programmation BVM951 Instant H C...
Страница 57: ...57 Sevice BVM951 Instant H C 6 8 2 BVM951 ESPRESSO Version HOT COLD Selection BVM951 Espresso H C...
Страница 58: ...58 Sevice BVM951 Espresso H C Programmation BVM951 Espresso H C...