INSTALLATION MANUAL
ENGLISH
The barrier is available with the operator fitted either to the left (looking from
the door side) or to the right.
The actuator is always supplied for left-hand side fitting.
6.1) Left-hand fitting
- Fix the operator to the foundation base and secure it by means of nuts
M12 (fig.4 ref.1). The door of the box must face towards the inside of the
property
- The upper surface of the operator is slightly tilted so as to prevent any
rain water from being trapped there. Therefore use a side surface to check
correct positioning by means of a level (fig.2).
- The installation of the MOOVI PRM antishearing Kit (optional) is easier
when carried out before fitting the boom to the operator.
Make reference to Fig.18 and paragraph 6.3 for correct fitting of the
MOOVI PRM Kit, then proceed to fit the boom.
- Fit the boom in its opening position (vertical) as indicated in fig.3, ref.7.
The operator balancing is pre-calibrated for the nominal boom in the
opening position (balancing spring stretched).
- Position the cover closing element (fig.3 ref.10) on the boom, as indicated
in fig. 3. After positioning, drill part 10 and boom using a 2 mm bit. Insert
the screw supplied.
- Fix the boom using the bracket (fig.3 ref.4) and the screws and washers
supplied as standard, then fix the protection cover (fig.3 ref.8) and finally
the screw cover (fig.3 ref.9). Close the protection cover by making the
closing element slide over the boom (fig.3 ref.10).
WARNING
!
The boom must be positioned so as to have the double
contour facing down (fig.3 ref.11).
- Balance the boom as described in relevant paragraph 7.
6.2) Right-hand fitting
Some internal members need to be moved, with reference to fig. 4 and the
following procedure:
A) Fix the box to the foundation base and lock it in position using M12
nuts.
B) Ensure that the balancing spring is in the opening position (stretched
spring - fig.5).
C) Completely slacken the spring stretcher (fig.4/ref. 2) until the screw (fig.
4/ref.3) anchoring it to the bottom of the box can be removed.
D) Remove the bar locking bracket (fig.4/ref.4) and slacken the screw (fig.
4/ref.5) by means of a CH19 socket spanner until the lever can be rota-
ted (fig.4/ref.6).
E) Rotate the lever (fig.4/ref.6) by 180° and fasten it into the correct posi-
tion.
F) Tighten the tie rod (fig. 4/ref.5) blocking the lever (fig.4/ref.6) by means
of a torque wrench set at about 80 N/m.
G) Bring the release key (fig.6) to the manual operation position and manually
rotate the lever (fig.4/ref.6) downwards by 90° (fig.7) so as to bring the
barrier to the right-hand opening position.
H) Lock the spring stretcher (fig.4/ref.2) into position (fig.4/ref.Dx) with the
screw and self-locking nut.
I) Adjust the spring stretcher (fig.4/ref.2) until the spring comes under tension.
L) Refit and partially fix the U bolt (fig.4/ref.4) holding the bar to the actua-tor
in the opening position.
M) The installation of the MOOVI PRM antishearing Kit (optional) is easier
when carried out before fitting the boom to the operator.
Make reference to Fig.18 and paragraph 6.3 for correct fitting of the
MOOVI PRM Kit, then proceed to fit the boom. Fit the boom in its opening
position (vertical) as indicated in fig.3, ref.7. The operator balancing is
pre-calibrated for the nominal boom in the opening position (balancing
spring stretched).
Position the cover closing element (fig.3 ref.10) on the boom, as indicated
in fig. 3. After positioning, drill part 10 and boom using a 2 mm bit. Insert
the screw supplied.
Fix the boom using the bracket (fig.3 ref.4) and the screws and washers
supplied as standard, then fix the protection cover (fig.3 ref.8) and finally
the screw cover (fig.3 ref.9). Close the protection cover by making the
closing element slide over the boom (fig.3 ref.10).
WARNING!
The boom must be positioned so as to have the double
contour facing down (fig.3 ref.11).
N) Carry out bar balancing as described in paragraph 7.
O) Invert the limit switch connections and the motor drive connections insi-de
the control unit (fig.15-16), with reference to the instructions regar-ding the
existing control unit. Fig.8 shows a diagram highlighting the connections
to be inverted.
6.3) Fitting of MOOVI PRM antishearing Kit (Fig.18)
1) Remove the rubber plugs.
2) Join two pivots “P” to antishearing plate “L” so as to obtain a single
body.
3) Fix the plate to the box by putting screw M6x20 through the central
threaded hole in the box.
4) Fix rotation lock screw M6x10 through the side threaded hole in the
box.
5) The antishearing plate is to be positioned on the boom opening, the lock
screw through the remaining hole.
6) During subsequent fitting of the cover, the plate must be inserted between
two guide pivots “D” fixed by means of screws C.
Having completed the fitting procedure, check that the antishearing plate
operates correctly. When the barrier is lifted, it must be in the position
indicated in Fig.18, ref.7; when the barrier is being closed, the plate must
follow the boom movement until it reaches the position indicated in Fig.18,
ref.8.
6.4) LAMPO/LAMPO-PA blinker fitting
(Fig. 19)
Blinker installation is carried using one of the two upper fittings on the
MOOVI barrier. It is indispensable to use the
SLM2
fixing bracket. It is also
recommended to install the blinker on the side of the barrier opposite to the
boom opening direction.
Making reference to Fig. 19, proceed as follows:
1) Remove protection cover “C” positioned on the barrier.
2) Remove cover “D” from the SLM” bracket.
3) Having laid the connection cables to the blinker, fix the SLM2 bracket to
the barrier by means of the appropriate screws (supplied).
4) Spacer “E” is only necessary for the “PA” series blinkers (suitable for the
receiver antenna). For blinkers without antennas, the base is to be directly
fixed to the SLM2 bracket.
5) Reposition cover “D”.
6) Complete fitting and wiring as specified in the instructions for LAMPO/
LAMPO-PA.
6.5) Photocell fitting
(Fig. 20)
The photocell can be installed on the MOOVI barrier as follows:
1- By directly fixing the
CELLULA 130
photocell to the side of the barrier
(Fig. 20 “A”)
2- By fastening the
MOOVI 130
photocell post to one of the front fittings
(Fig. 20 ”B”)
A) Cellula 130 fitting
1) Remove the protection cover positioned on the barrier.
2) Lay the wiring needed for photocell connection.
3) Fit the photocell as shown in Fig. 20 A by means of the appropriate
screws.
Refer to the instruction sheet for Cellula 130 for further information.
B) MOOVI 130 post fitting
1) Remove the protection cover positioned on the barrier.
2) Lay the wiring needed for photocell connection.
3) Fit post “F” and protection frame “G” as shown in Fig. 20B.
The post is fastened from inside the barrier by means of 3 screws (sup-
plied).
4) Fit the photocell to the post, as shown in the instruction sheet for Cellula
130.
Refer to the instruction sheet for Cellula 130 for further information.
6.6) Moovi accessories: boom length limits and balancing (Fig.21)
All barriers belonging to the MOOVI series are equipped with a hooking
bracket with 3 securing points located on the device for boom balancing
(Fig. 21 - ref. A points A-B-C).
The ideal securing point for correct balancing of the boom must be chosen
according to the barrier type and to the length of the boom and accessories
installed.
Tab.1 of Fig.21 shows the weight expressed in kgs by linear meter (kg/m)
for each accessory.
When the supporting leg Moovi GA/GAMA is used, it is necessary to calculate
the arbitrary weight in Kg/m, using the following formula:
Kg/m = 1,2/L
where L stands for the length of the boom.
Then proceed as follows:
1) Sum up the total linear weight of the accessories installed (including
boom weight).
2) Find the crossing point between the length of the boom and the total
weight of the accessories on the diagram, making reference to the MOOVI
model.
3) The point found in this way will indicate the correct hooking point (A-B-
C).
Example
MOOVI 50 with:
(boom measuring 4,0m + BIR + GAMA +1PCA).
(1,028+0,510+(1,2/4,0)+0,160)= 1,97
14
-
MOOVI 30-50 Ver. 06
D811386_06
P:14
Содержание MOOVI 30
Страница 2: ...2 MOOVI 30 50 Ver 06 D811386_06 P 2 ...