Transport, Installation and Connection
4-1
4
Transport, Installation and Con-
nection
All installation and connection work may be carried out by
qualified and approved specialist staff only !
The legal regulations as well as adjustment instructions of
the plant operator have to be observed!
4.1
Scope of delivery
•
Compact Flame Controller CFC 200
•
Operating instructions
•
3 m Connecting cable (with ex-proof housing)
•
Harting cable terminal box kit (not with ex-proof hous-
ing)
4.2
Accessories (optional)
•
Power supply unit 230/115 V AC
•
1" swivel mount with 2" flange disk
•
1” 3-way-ball-valve
•
1” heating insulator
•
pressure barriers
•
Optical alignment device
•
Fiber optic cable
Refer to the order papers for the exact scope of delivery
and compare with the delivery note.
4.3
Checking for completeness
Check the entire delivery for completeness against the ac-
companying delivery note. Please refer to our terms of
sale and delivery otherwise.
Содержание CFC 200
Страница 2: ......
Страница 11: ...General aspects 1 7 1 8 Declaration of conformity...
Страница 20: ...Safety 2 8...
Страница 26: ...Technical data 3 6...
Страница 42: ...Transport Installation and Connection 4 16...
Страница 46: ...Operation of the Compact Flame Controller 6 2...
Страница 48: ...Care and Maintenance 7 2...
Страница 50: ...Failures 8 2...
Страница 52: ...Order data 9 2...
Страница 54: ...Accessories 10 2...
Страница 55: ...Accessories 10 3...
Страница 56: ...Accessories 10 4 BFI Automation 2018...