Operation of the flame amplifier
6-1
6
Operation of the flame amplifier
All installation and connection work may be carried out by
qualified and approved specialist staff only !
Prior to initial operation, all regulations and adjustment
parameters set up by the operating company of the
burner have to be observed !
For the operation of the flame amplifier, please observe
the separate operating instructions of the flame scanner !
6.1
Connection of the flame amplifier
Prior to the connection of the flame scanner and a slide-in
power supply unit to the flame amplifier, observe the
separate operating instructions of the flame scanner and
of the slide-in power supply unit !
6.2
Testing the flame amplifier
In order to ensure a correct operation, flame amplifier as
well as flame scanner have to be tested several times in
case of all applications by starting and stopping the
burner several times (the flame relay has to be switched
off reliably in all cases in which the flame is absent). Carry
out this test whilst several neighbouring burners are
started and stopped and different boiler outputs are used.
This is an indispensable pre-requisite for a safe and cor-
rect operation of the device !
Содержание 3016
Страница 2: ...ii ...
Страница 20: ...Safety 2 8 ...
Страница 26: ...Technical data 3 6 ...
Страница 34: ...Transport installation and connection 4 8 ...
Страница 46: ...Maintenance and servicing 7 2 ...
Страница 48: ...Failures 8 2 ...
Страница 50: ...Order data 9 2 ...
Страница 54: ...Accessories 10 4 ...
Страница 55: ...Accessories 10 5 ...