BEVS 1818 Series - Это удивительное устройство с множеством функций. Чтобы узнать больше о его возможностях, загрузите бесплатное Руководство пользователя с manualshive.com. Не пропустите шанс получить всю необходимую информацию о продукте!
AUTOMATIC FILM APPLICATOR
BEVS 1818
User Manual
(
Version V201805
)
This manual shall be read carefully before starting. Directions included in this operation manual shall be strictly followed.
Страница 1: ...AUTOMATIC FILM APPLICATOR BEVS 1818 User Manual Version V201805 This manual shall be read carefully before starting Directions included in this operation manual shall be strictly followed...
Страница 2: ...oduction 1 2 1 Technical Specifications 2 3 Product Operation Introduction 3 3 1 Name and description of each part 3 3 2 Operation Steps 3 3 3 Touch Screen Operation 4 3 4 Parameter Setting 6 3 5 Syst...
Страница 3: ...film applicator is used to make uniform and traceable film with good reproducibility Manual operation is often uncoordinated especially between different operators which makes it difficult or even un...
Страница 4: ...aximum Film Length 250mm 2 13 Speed 1mm s 200mm s Adjustable 2 14 Speed Precision 1mm s 2 15 Dimensions length width height 450 mm 300 mm 210 mm 2 16 Test platform glass test platform or vacuum test p...
Страница 5: ...on the vacuum test platform or glass test platform and then fix it 6 When using glass test platform to make film clamp kits can be used to clamp the base material The base material is placed on the gl...
Страница 6: ...is the upper station 7 Refer to the 3 3 Touch Screen Operation 8 Press the Run button to start testing 3 3 Touch Screen Operation 3 3 1 Connect the power 24V 3 3 2 Turn on the power switch and check...
Страница 7: ...djust the position after vacuum adsorption 2 The base material must completely cover the pores on the vacuum table otherwise the adsorption strength will be greatly reduced or even unable to adsorb 3...
Страница 8: ...r The unit is mm s 1 2 The return speed can change the return speed of the push rod after returning to the position when the coating is finished the unit is mm s 1 3 Coating size you can set the film...
Страница 9: ...ting platform after the testing 4 3 Checking the tightness degree of belt per month and do some adjustment properly 4 4 Take apart the main machine once a year Incline the bottom remove the chassis an...
Страница 10: ...the machine in the solid working platform 5 3 Reliable ground lead is necessary in power outlet 5 4 Working Environment Using the machine in the inside room and the temperature is between 15 35 5 5 P...