background image

 

 

 

 

 

AUTOMATIC FILM APPLICATOR 

BEVS 1818 

User Manual 

Version V201805

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This manual shall be read carefully before starting. Directions included in this 
operation manual shall be strictly followed.

 

 

 

Содержание 1818 Series

Страница 1: ...AUTOMATIC FILM APPLICATOR BEVS 1818 User Manual Version V201805 This manual shall be read carefully before starting Directions included in this operation manual shall be strictly followed...

Страница 2: ...oduction 1 2 1 Technical Specifications 2 3 Product Operation Introduction 3 3 1 Name and description of each part 3 3 2 Operation Steps 3 3 3 Touch Screen Operation 4 3 4 Parameter Setting 6 3 5 Syst...

Страница 3: ...film applicator is used to make uniform and traceable film with good reproducibility Manual operation is often uncoordinated especially between different operators which makes it difficult or even un...

Страница 4: ...aximum Film Length 250mm 2 13 Speed 1mm s 200mm s Adjustable 2 14 Speed Precision 1mm s 2 15 Dimensions length width height 450 mm 300 mm 210 mm 2 16 Test platform glass test platform or vacuum test p...

Страница 5: ...on the vacuum test platform or glass test platform and then fix it 6 When using glass test platform to make film clamp kits can be used to clamp the base material The base material is placed on the gl...

Страница 6: ...is the upper station 7 Refer to the 3 3 Touch Screen Operation 8 Press the Run button to start testing 3 3 Touch Screen Operation 3 3 1 Connect the power 24V 3 3 2 Turn on the power switch and check...

Страница 7: ...djust the position after vacuum adsorption 2 The base material must completely cover the pores on the vacuum table otherwise the adsorption strength will be greatly reduced or even unable to adsorb 3...

Страница 8: ...r The unit is mm s 1 2 The return speed can change the return speed of the push rod after returning to the position when the coating is finished the unit is mm s 1 3 Coating size you can set the film...

Страница 9: ...ting platform after the testing 4 3 Checking the tightness degree of belt per month and do some adjustment properly 4 4 Take apart the main machine once a year Incline the bottom remove the chassis an...

Страница 10: ...the machine in the solid working platform 5 3 Reliable ground lead is necessary in power outlet 5 4 Working Environment Using the machine in the inside room and the temperature is between 15 35 5 5 P...

Отзывы: