3
3. Product Operation Introduction
3.1 Name and description of each part
3.2 Operation Steps
1. Place the instrument on horizontal surface.
2. Clean the vacuum test platform (or glass test platform) to avoid dust affecting the film.
3. Connect the power and turn on the power switch.
4. Connect the vacuum pipe and open the vacuum pump (outside); Do not need to connect the
vacuum pipe when use the glass test platform.
5. Place the coating test plate on the vacuum test platform (or glass test platform) and then fix it.
6.
When using glass test platform to make film, clamp kits can be used to clamp the base material.
The base material is placed on the glass test platform, which can be clamped by turning the handle
on the clamp backwards. The clamp kits is divided into two parts, the lower station is suitable for
0-2.5MM base material, and the upper station is suitable for 2.5-5MM base material. When the
upper and lower positions of the clamp kits are changed, the locking screw of the clamp kits
position should be loosened first, press the clamp to the lowest position by hand, and tighten the