6.0  TESTING and TROUBLESHOOTING 

 

PRIOR TO TESTING THIS PANEL, ENSURE NO ONE IS WORKING 

ON OR NEAR THE EQUIPMENT THAT THIS PANEL FEEDS. 

 

 
 
 
 
 
 
 
 

 

Symptom

 

Possible Solutions

 

No Power to the X-Ray 
Generator 

  If attempting to energize the X-Ray immediately after applying power, the system 

will not turn on; ten seconds must pass before starting the system in order to allow 
the safety relay to start up. 

  Verify the 3Ø incoming power is present at the top of Q1. 

  Verify the Main Circuit Breaker is ON. 

  Verify the DC power supply circuit breaker (F2) is on and the DC power supply is 

producing 24VDC. 

  Verify the control power circuit breaker (F4) is on. 

  Verify S11 (Stop) is not depressed. 

  Verify no Emergency Stop Pushbuttons are depressed and they are correctly wired 

to terminals X02. 

  Check the four lights on the front of the safety relay, when ready, the DEVICE light 

should be solid green.  When all e-stops are released, the IN light should be solid 
green and the Safeties OK light on the front of the panel should be lit. 

  Press the Start button, contactor K2 should pull in.  If not, check the OUT light on 

the safety relay, if not solid green, press and hold the RESET button for five 
seconds then release.  The lights should flash and the DEVICE and IN light should 
be green.  Press the Start button, contactor K2 should pull in. 

  If the DEVICE light is red, the safety relay is defective and must be replaced. 

 
For other Safety Relay Conditions, refer to the diagram and chart next page. 
 

PDA Off circuit inoperable 

  Verify the PDA field wiring is not crossed between terminals X03 and X04. 

  Verify 24Vdc is present at X03 

  Verify Safeties OK is lit on the front door.  If not, see above. 

X-Ray ON Warning Light 
does not turn on as 
expected 

  Verify the circuit breaker from the lighting panel is turned on. 

  Verify the signal, either 24 Volts AC or 24 Volts DC, is present on terminals 1 and 2 

of terminal block X06. 

  Verify Continuity between terminals 3 and 4 of terminal bloc X06 if dry contact 

provided by Siemens System Cabinet. 

  Verify K5 is off 

Room lights does not turn 
off as expected 

  Verify the circuit breaker from the lighting panel is turned on. 

  Verify the signal, either 24 Volts AC or 24 Volts DC, is present on terminals 1 and 2 

of terminal block X05. 

  Verify Continuity between terminals 3 and 4 of terminal bloc X05 if dry contact 

provided by Siemens System Cabinet. 

  Verify K4 is on. 

WARNING!

PARTS, TECHNICAL SUPPORT AND SERVICE 

FOR INQUIRIES DURING INSTALLATION 

CONTACT BEVCO ENGINEERING, 

SUSSEX WI (262) 820-2400 

 

FOR ISSUES FOLLOWING INSTALLATION, 

CONTACT SIEMENS UPTIME CENTER, 

(800) 888-7436

 

Содержание IECAX480V125A

Страница 1: ...ications Installation Operation and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET for ARTIS Q Q ZEN ONE ARTIS ZEEGO ZEEGO ZEN ARTIS ZEE MULTIPURPOSE SINGLE PLANE IECAX480V125A Main Disconnect Panel ...

Страница 2: ... of Bevco Engineering Company Troubleshooting and servicing should be performed by a qualified electrician De energize and lockout the main disconnect before servicing this panel Table of Contents 1 0 DESCRIPTION OF OPERATION 3 2 0 SYSTEM CONFIGURATION 4 3 0 SPECIFICATIONS 5 ELECTRICAL SPECIFICATIONS 5 SEISMIC SPECIFICATIONS 5 ENVIORNMENTAL SPECIFICATIONS 5 ELECTRICAL WIRING DIAGRAM 5 4 0 PANEL DI...

Страница 3: ...3 and controlled by contactor K6 The contactor will open with any loss of power or by pressing any Emergency Power Off EPO pushbutton The control circuits for the EPOs are low voltage 24 VDC and are fully powered from within the panel The restart functionality and EPO circuitry is controlled with a safety relay K10 See page 11 for detail The white SAFETIES OK indicator light on the front of the pa...

Страница 4: ...R K4 ROOM LIGHT RELAY K5 WARNING LIGHT RELAY EMERGENCY POWER OFF CIRCUITS EPO1 EPO2 LIGHTING POWER PANEL 120 277V KEY TO COMPONENTS Q1 MAIN CIRCUIT BREAKER Q2 GENERATOR 2 CIRCUIT BREAKER Q3 GENERATOR 1 CIRCUIT BREAKER F2 POWER SUPPLY FUSES F4 DC CIRCUIT BREAKER G01 DC POWER SUPPLY K1 SAFETY CONTACTOR K2 X RAY GENERATOR CONTACTOR K4 ROOM LIGHT RELAY K5 X RAY ON WARNING LIGHT RELAY K6 SYSTEM CABINET...

Страница 5: ...nd Neutral 125 Amps cULus Short Circuit Current Rating is 35 000 Amperes RMS Symmetrical 480V SEISMIC SPECIFICATIONS This Integrated Electrical Cabinet has been certified by an independent California structural engineer in conformance with the shake testing requirements of ICC AC 156 The California OSHPD number is OSP 0457 10 The seismic performance characteristics are as follows SDS g 2 56 z h 1 ...

Страница 6: ...el may be recessed into the wall up to 5 inches for semi flush installations See Illustrations below for typical front and side views with the mounting hole pattern Refer to the drawing set provided with the panel for total weight and center of gravity dimensions PANEL EXTERNAL PHYSICAL DIMENSIONS Parameter Dimensions Height 30 0 inches 762 mm Width 20 0 inches 508 mm Total Depth 9 44 inches 244 m...

Страница 7: ... CABINET Installation Operation and Service Manual Copyright 2016 Bevco Engineering Company Inc W222N5739 Miller Way Sussex WI 53089 USA IECAX480V125A OM1_R51 Siemens IEC Manual for AX Systems Page 7 of 14 CENTER OF GRAVITY ...

Страница 8: ...INET Installation Operation and Service Manual Copyright 2016 Bevco Engineering Company Inc W222N5739 Miller Way Sussex WI 53089 USA IECAX480V125A OM1_R51 Siemens IEC Manual for AX Systems Page 8 of 14 MOUNTING HOLE DIMENSIONS ...

Страница 9: ...ectly to the load side of contactor K2 terminals 2T1 4T2 and 6T3 5 Connect the System Cabinet SC1 directly to the load side of contactor K6 terminals 2T1 4T2 and 6T3 6 Connect the IEC Emergency Power Off EPO circuits to terminals 1 and 2 of X02 All EPOs should have normally closed contacts wired in series See EPO wiring diagram 7 Room light controls are on terminals X05 1 through 4 Verify first if...

Страница 10: ...e Manual Copyright 2016 Bevco Engineering Company Inc W222N5739 Miller Way Sussex WI 53089 USA IECAX480V125A OM1_R51 Siemens IEC Manual for AX Systems Page 10 of 14 INSTALLATION continued TERMINAL LAYOUT Located in the bottom left of the Disconnect Panel EPO WIRING ...

Страница 11: ...Installation Operation and Service Manual Copyright 2016 Bevco Engineering Company Inc W222N5739 Miller Way Sussex WI 53089 USA IECAX480V125A OM1_R51 Siemens IEC Manual for AX Systems Page 11 of 14 LIGHTING WIRING DOOR SWITCH WIRING ...

Страница 12: ...k the OUT light on the safety relay if not solid green press and hold the RESET button for five seconds then release The lights should flash and the DEVICE and IN light should be green Press the Start button contactor K2 should pull in If the DEVICE light is red the safety relay is defective and must be replaced For other Safety Relay Conditions refer to the diagram and chart next page PDA Off cir...

Страница 13: ...016 Bevco Engineering Company Inc W222N5739 Miller Way Sussex WI 53089 USA IECAX480V125A OM1_R51 Siemens IEC Manual for AX Systems Page 13 of 14 K10 Safety Relay configurations The Safety Relay DIP switches are set as follows from the factory 1 2 3 4 5 6 7 8 On On Off On On On On Off ...

Страница 14: ...ervicing 8 0 REPLACEMENT PARTS 9 0 DOCUMENT REVISION HISTORY REV DATE AUTHOR DESCRIPTION OF CHANGE 1 10 03 2013 RJB Initial Release 2 02 27 2015 RJB Added Artis Tradenames on first page 3 03 09 2015 XYUE Update the manual based on schematic 50 03 30 16 DRO IEC Redesign 51 07 10 18 JT Update of system config data PARTS TECHNICAL SUPPORT AND SERVICE FOR INQUIRIES DURING INSTALLATION CONTACT BEVCO EN...

Отзывы: