Unpacking and Installation
BETTCHER
Industries, Inc.
Manual No. 185321
June 15, 2018
Unpacking and Installation
Operation and Maintenance Manual
3-3
Installation
Work Station and Lighting
Place the Bettcher
®
AutoEdge on a bench surface of standard working position height. Appropriate
lighting should be available. Head and hands are to be kept at a safe distance from the grinder wheel
and blade during operation.
230V Machines Only:
A plug is not provided with this machine. A way to disconnect, in the form of a
plug or switch, must be attached to the power cord to assure proper disconnect of all poles.
COMPANY
CONFIDENTIAL
Содержание AutoEdge
Страница 4: ...C O M P A N Y C O N F I D E N T I A L ...