SECTION B | INSTALLATION
PART D
–
BLIND INSTALLATION
STEP 9
–
TEST BLIND OPERATION
For motor operation, ensure wiring is correct and motor is operating correctly. For gear
operation, ensure operation is smooth.
Once blind is operating correctly, proceed to next steps.
Page. 11